初三英语下学期thepassivevoice内容摘要:

to(for) sb. 表示持续、开业、发生的动词,不用被动。 For example:open, last, happen, take place. The meeting lasted nearly an hour The shop opens at 6 . every day An accident happened this morning When does the bank open every day? Choose the best answer. ’t worry . All the children _____ by the nurse. A. are well taken care of B. take good care of C. are taken good care D. take good care 2. Mr. John’s story _______ by everyone who heard it . A. laughed at B. was laughed C. laughed D. was laughed at 3. At the end of the meeting Miss Green _______ two minutes to decide whether she should join the project or not. A gave B. had given C. was given D. was giving A D c ( a) Correct the mistake(s) in each sentence if any: 1)The singer lived in London until he was sen。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。