冠词和数词强化训练题内容摘要:

t____ writer. Wang Lin’s is on ___ science. A. a。 a。 / B. the。 /。 the C. /。 the。 / D. a。 the。 a 18. ______ Physics is_____ science of matter and energy. A. The。 / B. /。 / C. /。 the D. A。 a 19. _____ sun rises in_____ east and sets in_____ west. A. A。 an。 a B. The。 /。 / C. The。 the。 the D. A。 the。 a 20. They were at ____ dinner then. It was____ delicious one. A. a。 the B. /。 / C. /。 a D. a。 a 21. I’m sure that he will be back in ____. A. a day or two B. one day or two C. a or two days D. one or two day 22. He served the army in _____, when he was in ____. A. 1980’s , his twenties B. 1980’s , the twenties C. the 1980’s , his twenties D. the 1980’s , the twenties 23. Every few ____ along the Great Wall there are some watch towers. A. hundred metres B. hundreds metre C. hundreds of metre D. hundred of metres 24. She went to the market and bought three ___ eggs and some ____. A. dozen, meats B. dozens。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。