十二章数学活动(苏教版)内容摘要:

S $ 2 in her bag. The next day she had to give US $10 for a lunch to a coworker. She didn39。 t want to get up early to go to the bank. So she had to get to the bank at night. She used her ATM card to withdraw (take out) US $ 50 from her checking account. These are the steps she followed to withdraw money. First, she put her card into the lower slot on the right side of the machine. She made sure that her card was facing the right way. Second, the puter screen said, Please enter your PIN. Pat pressed the numbers 1, 2, 3 and 4. Next the screen said, Please select the type of transaction you want by pressing another key. Pat pressed the bottom key for withdrawing money. Then the screen said, From which account? The choices it gave were Checking, “saving” and “Money market”. Pat pressed the key for Checking. Next, the screen said, Please select amount of transaction.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。