初三语法复习课件--介词新目标内容摘要:

__ help. A. with。 for B. in。 for C. under。 at D. into。 out The boy filled the bottle ______ some milk. Now it’s full ______ milk. A. with。 with B. of。 with C. with。 of D. off。 without Mother always talks _____ her friends _____ the phone ______ weekend. A. with。 on。 at B. to。 with。 on C. about。 on。 through D. of。 by。 at –When did he lend the dictionary _____ you? I borrowed it _____ him the day before yesterday. A. from。 to B. to。 by C. to。 from D. on。 out of Uncle Wang lives _____ a farm, but he works ______ a factory. A. in。 in B. to。 in C. in。 at D. on。 in She came up to me, _____ a smile _____ her face. A. with。 in B. like。 on C. with。 on D. without。 at He wanted to ask _____ some books ______ music. A. for。 in B. about。 of C. for。 on D. about。 about His school is far _____ his home, but near ______ mine. A. from。 to B. from。 from C. to。 to D. to。 from 提高型 综 合 型 1. The bridge _____ the river is made ______ big stone. A. on。 from B. over。 of C. above。 in D. of。 into 2. He stayed _____ his uncle’s _____ a week. A. in。 for B. with。 till C. at。 for D. for。 about 3. I can’t swim _____ the river _____ a piece of wood. A. across。 without。 with。 on D. in。 by 4. The desk _____ the teacher is ______ the classroom. A. of。 in front B. to。 in fro。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。