倒装句的运用内容摘要:

who devoted himself to the cause of munism. So busy is the dentist that he has no time to spare. Such was Albert Einstein, a single man of great achievements. 地点状语提前,为了保持句子平衡且谓语是 be , stand, sit , lie 等动词时。 On every piece of paper was a picture of a horse. From a speaker on the wall es the doctor’s voice. On the ground lay a stick goat. 二、部分倒装 在以 so, nor, neither 开头的句子里。 A fish can swim and so can I. We have had breakfast and so have they. I get up at seven and so does my brother. He didn’t do it and neither did I. The boy can’t skate and nor can the girl. He didn’t smoke, nor did he drink. If you don’t want it, neither shall I. He is not a businessman, neither does he wish to be. 注意:1)如果后一个句子只是单纯的重复前面句子的意思,则不倒装。 “ It is hot today”,”So it is.”。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。