主谓一致专练内容摘要:

to finish the work on time. ( be ) 19. What they needed _____ some water. ( be ) 20. Nearly 60 percent of the students in our class ____ boys. ( be ) 21. More than two thirds of the surface of the earth ___ covered by water. ( be ) 22. Neither my parents nor my sister _______ known the secret. ( have ) 23. There ___ some water and stones in the bottle. ( be ) are is is are is has is 三.对比选择填空: 1. a. He is the only one of the students that _______ got full mark. b. He is one of the students that ______ got full make. A. is B. are C. has D. have 2. a. Three fourths of the teachers present _____ against the plan. b. Three fourths of the surface of the earth ______ covered with water. A. is B. are C. was D. were 3. a. The famous singer and dancer ____ our party this evening. b. The famous singer and the famous dancer _____ our party this evening. A. are going to attend B. was to attend C. were to attend D. is going to attend C D B A D A 4. a. A number of students ____ from the country. b. The number of students _____ 900. A. is B. are C. has D. have 5. a. Where and when to have the party _____ not been decided yet. b. What I say and think _____ nothing to do with you. A. is B. has C. are D. have 6. a. Many a boy ______ this kind of bicycle. b. Many boys ______ this kind of bicycle. A. like B. likes 7. a. All but one ________ here now. b. There is nothing unusual. All _____ going well. A. has B. is C. have D. are B A B B B A D B 8. a. What she wants ____ more time. b. What she wants ____ more sheep. A. has B. have C. is D. are 9. a. I can work out two of the five problems, but the rest ______ too difficult for me. b. I have finished one third of the work and the rest _____ left for you. A. is B. are C. has D. have 10. a. The population of the small country _____ 600,000. b. Two thirds of the p。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。