七年级英语上学期whereismybackpack新目标内容摘要:

e puter game? ’s the plant? are the books? are the keys? It’s in the backpack. It’s under the bed. It’s on the table. They’re on the sofa. They’re on the dresser. It’s under the table. Look at the picture, ask and answer the questions. plant chair table bed sofa dresser drawer bookcase in on under 本课生词 where they 本课句型 Where’s my / the baseball? It’s in the backpack. Where are my / the books? They’re on the sofa. Where’s my / the backpack? It’s under the table. 1.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。