机构名称:大庆油田有限责任公司采油工程研究院采油工程产内容摘要:

rable detective cable 1 *all items 0424 Load bearable detective cable SY/T 66002020 10 Progressing cavity pump systems for artificial lift Pumps( Progressing cavity pumps) 1 *all items 0346 Downhole equipment for petroleum and natural gas industries Progressing cavity pump systems for artificial lift Part 1: PumpsGB/T 11 Progressing cavity pump systems for artificial lift – Surfacedrive systems( Drive head of progressing cavity pumping system) 1 *all items 0422 Downhole equipment for petroleum and natural gas industries – Progressing cavity pump systems for artificial lift –part 2:Surfacedrive systemsGB/T –drive heads for progressing cavity pump Q/SY DQ14442020 12 progressing cavity pumping system control panel 1 *part items 0422 Electrical control assembliesGB/T 37972020 Except for EMC electromagic patibility test. ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L2074 第 14 页 共 51 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 13 Sucker Rods 1 *part items 0357 Sucker RodsSY/T 50292020Metallic materials torsion test at room temperature GB/T 101282020 Accredited only for sucker rod and collar 14 Supperstrength sucker rod 1 *all items 0357 Sucker Rods SY/T 50292020 15 Hollow Sucker rod 1 *part items 0357 Specification for hollow Sucker rod SY/T55502020 Except for electric heater unit 16 Packers used in the oil and gas fields 1 all items 0301 The general technical factors of Packers used in the oil and gas fields SY/T 51061998Packing Element of Compression Packer Uesed in oil /Gas Oilfield HG/T27011995 Packing Element of Swelling Packer Uesed in Oil/Gas Oilfield HG/T27021995 17 Eccentric water injection tools 1 part items 0301 Eccentric water injection tools SY/T 52752020 Accredited only for eccentric injection mandrel 18 Threadoff unit for sucker rod pump 1 all items 0301 Latchin type threadoff unit for sucker rod pump SY/T 57321995 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L2074 第 15 页 共 51 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 19 Rotary amp。 milling shoes for workover 1 all items 0349 Milling tools for drilling and servicing SY/T 60722020 20 Waterbased fracturing fluid 1 part items 0212 Remended practices on measuring the properties of waterbased fracturing fluid SY/T 51072020General technical specifications of fracturing fluids SY/T 63762020 Except for the test of dynamic filtration and depressed resistance rate 21 Sesbania gum for fracturing 1 all items 0212 General technical specifications of natural plant gum for fracturing SY/T 57642020 22 Coumarin gum for fracturing 1 all items 0212 General technical specifications of natural plant gum for fracturing SY/T 57642020 23 Guar gum for cturing 1 all items 0212 General technical specifications of natural plant gum for fracturing SY/T 57642020 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L2074 第 16 页 共 51 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 24 hydroxypropyl guar for cturing 1 all items 0212 General technical specifications of natural plant gum for fracturing SY/T 57642020 25 Fracturing proppant 1 all items 0203 Remended practice for testing proppants used in hydraulic fracturing operations SY/T 51082020 Remended practice for evaluating shortterm proppant pack conductivity SY/T 63022020 Specifications of proppants used in hydraulic fracturing Q/SY 1252020 26 Barite for drilling fluids 1 all items 0203 Drilling fluid materials specifications GB/T 50052020 27 Haematite for drilling fluids 1 all items 0203 28 Bentonite for drilling fluids 1 all items 0203 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L2074 第 17 页 共 51 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 29 Drilling fluids 1 part items 0212 Petroleum and natural gas industriesField testing of drilling fluids Part 1: Waterbased fluids GB/T Except for the capacity of methyleneblue,calcareousness,chloridion and total hardness by accounting of calcium ions 30 Low solidphase kill fluid Evaluation 1 all items 0212 Performance specifications and measuring methods of lowsolid killing fluid SY/T 58342020 31 Completion fluid 1 part items 0212 Remended index and analytical method for injected water quality used for clastic rock reservoir SY/T 532994 Accredited only。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。