基于图像的三维重建毕业论文外文翻译内容摘要:

eedimensional reconstruction of the building systems, design the corresponding algorithm to reduce end user workload. The main contributions are the following: 1 .Present a building reconstruction and modeling system which allows novice users to create textured polygonal models from a set of photographs of a building. 2. At present, the extracted information contains too many inconsistencies, missing features, and unwanted noise to be pletely reliable. Therefore, we aim at creating a semiautomatic solution which helps reduce steps in footprint drawing process and increase the accuracy of the result. 3. Exacting building footprint from point cloud. We have designed an algorithm to predict the continuation of a usertraced line segment。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。