基于matlab的fir数字滤波器的设计与仿真(英文翻译内容摘要:
(b) A3 (f) A4 (f) 1 1 Digital filter design Digital filter design of the basic requirements Digital filter design must go through three steps : (1) Identification of indicators : In the design of a filter, there must be some indicators. These indicators should be determined on the basis of the application. In many practical applications, digital filters are often used to achieve the frequency operation. Therefore, indicators in the form of ge neral jurisdiction given frequency range and phase response. Margins key indicators given in two ways. The first is absolute indicators. It provides a function to respond to the demands of the general application of FIR filter design. The second indicator is the relative indicators. Its value in the form of answers to decibels. In engineering practice, the most popular of such indicators. For phase response indicators forms, usually in the hope that the system with a linear phase frequency bands human. Using linear phase filter design with the following response to the indicators strengths: ① it only contains a few algorithms, no plural operations; ② there is delay distortion, only a fixed amount of delay。 ③ the filter length N (number of bands for N1), the volume calculation for N/2 magnitude. (2) Model approach : Once identified indicators can use a previous study of the basic principles and relationships, a filter model to be closer to the target system. (3) Achieved : the results of the above two filters, usually by differential equations, system function or pulse response to describe. According to this description of hardware or software used to achieve it. MATLAB introduced MATLAB is a matrix laboratory (Matrix Laboratory) is intended. In addition to an excellent value calculation capability, it also provides professional symbols terms, word processing, visualization modeling, simulation and realtime control functions. MATLAB as the world39。 s top mathematical software applications, with a strong engineering puting, algorithms research, engineering drawings, applications development, data analysis and dynamic simulation, and other functions, in aerospace, mechanical manufacturing and construction fields playing an increasingly important role. And the C language function rich, the use of flexibility, highefficiency goals procedures. High language both advantages as well as low level language features. Therefore, C language is the most widely used programming language. Although MATLAB is a plete, fully functional programming environment, but in some cases, data and procedures with the external environment of the world is very necessary and useful. Filter design usin。基于matlab的fir数字滤波器的设计与仿真(英文翻译
相关推荐
wx,cx, cy, angle) frontalmodel=rgb2gray(frontalmodel)。 model_rot = imresize(frontalmodel,[ly wx],39。 bilinear39。 )。 % 调整模板大小 model_rot = imrotate(model_rot,angle,39。 bilinear39。 )。 % 旋转模板 [l,r,u,d] =
b 语言语法限制不严格 ,程序设计自由度大 ,程序的可移植性好。 Matlab 还推出了功能强大的适应于图像分析和处理的工具箱 ,常用的有图像 处理工具箱、小波分析工具箱及数字信号处理工具箱。 利用这些工具箱 ,我们可以很方便的从各个方面对图像的性质进行深入的研究。 Matlab 图像处理工具箱支持索引图像、 RGB 图像、灰度图像、二进制图像并能操作 .bmp、 jpg
波)的已调波形,而且 ω1 与 ω2 之间的改变是瞬间完成的。 2FSK 信号的产生如图 所示: 图 2FSK 信号产生方法 2FSK 信号最常用的解调方法是采用的相干检测法,如图 所示 :图 2FSK 相干解调的方法 Simulink 通信工具箱中提供了专门的 FSK 调制和解调模块,应用FSK 调 制模块能方便的产生 2FSK 信号。 因此,设计 2FSK 仿真模型时,只需根据图 所示框图
a analysis and numerical calculation of the advanced technology and the interactive language environment. As a powerful scientific puting platforms, it almost to satisfy all puting requirements. As
接搜索引擎的新时代。 Lucene 简介 最初 Lucene 是 Apache 软件基金会 Jakarta 项目组 的 子项目,是一个完全开放源码的全文检索工具包。 Lucene的原作者是 Doug Cutting,他是一位资深全文检索专家, VTwin搜索引擎的主要开发者。 2020年 3月 Doug Cutting把 Lucene转移到 SourceFe上, 2020年 10月献给
, 到到 控控 制制 线线。 用用 LPC2124的的 个个 端端 口口 来来 控控 制制 键键 盘盘 进进 行行 扫扫 描描 , 来来 实实 现现 键键 盘盘 值值 的的 读读 取取 , 其其 中中 到到 送送 扫扫 描描 数数 据据 , 可可 以以 确确 定定 按按 下下 的的 键键 在在 矩矩 阵阵 键键 盘盘 中中 的的 行行 , 键键 盘盘 的的 值值 来来 确确 定定 按按 下下