基于gsm的车载防盗系统中英文翻译内容摘要:

ight emitter diode, may also let the vehicle owner know system39。 s active status, may also to spy on partment39。 s car thief to play the warming role. When automobile, because the external force has the vibration., When before or the vehicle door, the reserve box lid, the engine room coverlet opens forcefully, the system exudes the warming sound, scares robs the vehicle thief. Has the bidirectional alarm system, has been able to inform vehicle 英文文献翻译 owner39。 s function pared to the pure flash and sound alarm system many, when the automobile encounters the outside invasion, can know automobile39。 s condition in the nearby vehicle owner through the body carrying liquid crystal display key. Third, the work type burglary protection system,mainly depends upon social the public work to monitor vehicles39。 travel. Ist , the GPS satellite positioning security department, it through the GPS satellite position system, the definite vehicle39。 s position, again transmits through the GSM the position and the alarm message to the warming center. The warming center through the GSM control automobile, the power failure/breaks the oil. The shorting is the price is high。 Needs to pay the service fee frequently。 System operation39。 s power is big。 The confidentiality will receive the invasion。 The vehicles longterm laying aside dose not use can exhaust the level electronic quantity. The vehicle stops under underground, the tree, the building approaches, the indoor system not to have an effect,2nd, GSM, GPRS move security, GSM moves security it to depend on the GSM munication work, carries on the handset and automobile39。 s intelligent linkage security, has security, the monitoring, the remote control, the longdistance warming, the localization, instead to plunder and so on many kinds of functions, is maintains the social order, to protect the vehicle owner benefit the measure. Compares with the similar products, this system also has the installment to be more covert, the technology to be more advanced, the performance to be more reliable and so on characteristics. Has cannot construct the base depot, the warming not to be away from the limit. The shorting is needs to pay the GSM number the month rent. Relies on the GSN 39。 s cover. Bandits and thieves39。 method also uses the handset signal jammer, blocks the vehicles and the warming center relation, burglary protection system expiration. Fourth, the biological recognition burglary protection system, takes the only unlocking using the human body characteristic the key, locks the motor car engine. The concrete product has the automobile fingerprint start controller and the vein scanning controller. Massive information which carries using the human body fingerprint,as well as each person39。 s fingerprint39。 s superposition rate is zero characteristic nearly, deposits the vehicle owner fingerprint beforehand in this system the information, after verifying the status can start the automobile through the fingerprint ratio, even if robs Che Zei to steal away pletely the automobile key is also at a loss. Before the shorting is starts the automobile, many ratios to the fingerprint movement, needs to spend 2 seconds. The bandits and thieves do not have the means to obtain your fingerprint, he dose not hav。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。