(最新)土木工程专业英语结课论文内容摘要:

y should the pit ( groove ) bottom soil prehensive observation. ① soil and the color is the same。 ② soil hardness is uniform, there is no local soft or strong。 ③ soil moisture content is abnormal or not, there is no too dry or wet。 ④ pit ( groove ) in bottom walking or tamping shooting without tremor or hole sound phenomenon. Through the above observation to analyze and judge the pit ( groove ) bottom dig to old soil ( bearing layer of Foundation ), whether to continue to dig or processing. Trough inspection should focus on to a load bearing walls, wall, or other larger force parts of the mainly. II, brazing trough inspection Brazing is a hammer into the pit ( groove ) steel under the soil in certain depth, according to the number of hammering and has difficulty to judge the soil soft and has no hole, hole, curtain cave and soft bottom layer. Brazing procedure is as follows: ① according to the pit ( groove ) plans for the drilling sites, and drill detecting points are sequentially numbered drawing drill detecting point layout。 ② preparation of hammer and drill rod, a drill diameter engineering should be consistent, the heavy hammer is consistent。 ③ press drilling sequence number for drilling construction。 ④ drilling, requirements to consistent, hammer drop distance consistent. Each peration30CM ( called step ), recording a hammering number, fill in the drill rod detection record。 ⑤ After the end of the drill rod detection, to from go up by step analysis of brazing records, and horizontal analysis of drill hole between the number of hammering, can determine soil structure and soil hardness, and should be the number of hammering to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。