轴承架零件的机械加工工艺规程及工艺装备设计(钻孔ф内容摘要:

of machine tool fixture design reference manual and related to the use of surface fi xture design books, the basic principles and methods, fixture design program to develop design efficient, laborsaving, economic rationality and processing to ensure the quality of the fixture. Throughout the curriculum design process was pleted parts map, blank map of the specific folder and the folder assembly mapping specific parts. 目 录 1 零件的分析 ................................... 1 轴承架的作用 ............................ 1 轴承架的技术要求 ........................ 1 审查轴承架的工艺性 ....................... 2 2 轴承架毛坯的确定 .............................. 2 确定轴承架的生产类型 ..................... 2 确定毛坯的类型和制造方法 .................. 3 3 拟定工艺路线 .................................. 3 定位基准的选择 ........................... 3 确定各表面的加工方法 ..................... 4 加工阶段的划分 ........................... 4 工艺线路方案 ............................. 4 确定各工序的加工余量 ..................... 5 4 Ф30 Ф35 孔切削用量的计算 ..................... 7 钻孔工步切削用量的计算 ................... 7 扩孔工步切削用量的计算 ................... 8 5 加工 Ф3。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。