毕业设计论文_基于plc的电镀车间专用行车自动控制系统设计内容摘要:

ion equipm ent and t ool, using m obile ident if icat ion Term inal, and law enf or cem ent r ecor ds inst r ument, t echnol gy ident if ication m eans. As t o 20XX years J une 20 st at ewide m ot or vehicle keep volum e f or 567, 408 car , and last year ear lier t han gr owt h 75, 814 car , gr owt h 13. 36%。 t his year J anuar y J une, vehicles m anagem ent section and license ar chives m anagem ent section t ot al accepted t he m ot or vehicle r egist r at ion business 42, 543 car t im es, which r egist er ed r egist ration 6, 905 car t im es, and t r ansf er r egist r ation 3, 592 car t im es, and change r egist r at ion 1033 car t im es, and m ort gage r egist r ation 696 car t im es, and cancelat ion r egist r ation 187 car t im es, and int o business 980 car t im es, and Ar chives cor rections 81 pieces t im es, and issued t est qualif ied logo 25, 429 car t im es, and ot her vehicles business 3, 640 car t im es。 super vision Sur vey Section r elies on m ot or vehicle det ection r em ot e issued t est qualif ied logo sof t war e plat f or m supervision m ot or vehicle t est, and ident if icat ion sit uation 7418l iangci, invest igat ion m ot or vehicle exception business 30 car t im es, his par ds business war ning 244 ar t icle, vehicles and dr iving people sound video r egulat or y scr eenshot s 1852 Zhang, checks m ot or vehicle ar chives 716 pieces t im es, and m edium bus, and m edium above t r uck, and Of hazar dous chemicals, vehicles and school buses and ot her key vehicle inspection r ecor d of 420. ( C) based on t heir own, and st rict adherence t o def ense, m or e cheat ing, f alse f alse f ugit ive suspect s, r obber y suspect vehicles and t he I nt er cr ackdown. DM V f ul play t o t he f ir st line of Def ense posit ion cont r ol, invest igating cheating, f ake ident if icat ion and r obbery suspect vehicles t hr ough oper ational wor k, and car ef uly examine t he docum ent s and legal pr oof , check t r af fic violat ions, t r af fic accident s, t he f ugit ive suspect suspected vehicles and t hef t han t o wor k, f ur ther t ight car, dr iving m anagem ent business f orm alit ies r eview pr ocedur es. . Tr uck dr iver inf or m at ion m anagem ent plat f or m. M ot or vehicles and t r af fic police depar t m ent s, St at e t r anspor t aut hor it y t o f ur t her clar if y t he Division of labour , im plem ent ation r esponsibilt y, st r engt hen our colabor ation and m anagem ent ogether, r einf or cing t he m anagem ent of dr iver s on which st r ongly synt het ic war f ar e and inf orm ation war f ar e. 3 st r ict ly im plem ent ed. Fr om M ay 1 up, a is im plem ent ed plex r oad and bad weat her dr iving exam, cur rently DM V is ur ged cont r act or s par t y in t r easur es dr iving school incr eased sim ulat ion Highway, and cont inuous ur gent det our s, and snow days, and wet sliding r oad, and bur st sit uat ion disposal, subj ect s I I f ield t o dr iving exam pr oject , is expected Abstract Plating lane is an important equipment for material transfering in modern factory,realizing automation can make lane finish series of action automatically according to scheduled order and controled ,as a electronic device for number crunching operation, is designed for industrial environmet application,it can control all types of industrial equipment and production control of plating lane is relaycontact control system,the application is very much in actual project,but with the development of modern industry and technology,widely used of plating in mechanical, instrumentation and defense industry and other productive sectors ,and the increasing petitive in market,enterprises urgently need to improve production efficiency and product quality,so how to promote automatic control performance electroplating production line has important design uses a PLC control system to replace the original relaycontact control system to control traffic on the plating. In this paper,nickel plating automatic production line contol system design is used for the study object, dedicated plating lane for the control object,analyzing plating process requirements and control requirements,using theoretical research methods , designing automatic control system of electroplating workshop dedicated lane based on system selects the Mitsubishi FX PLC to be controlled model, PLC output signals control the operation of two induction motors through the contacts of the contact action in order to achieve the level of traffic movement and control of the vertical movement of the that the rust, plating, up, down and other movement requires accurate driving and stop bits hook into account ,so installing limit swithes in each location which is needed is necessary,using limit swithes contact action as PLC input signal to control output signal,then control the motor stops, so you can make accurate driving and stopbit order to facilitate adjustment and maintenance of equipment in the program evaluat ion of scient if ic developm ent . Natur e secur it y t ype natur e securit y is t o m aint enance people of healt h value f or t arget , t hrough st rengthening secur it y based m anagement , and r is k m anagement , and equipm ent m anagement and t echnology super vision, ensur e pr oduction in t he people, and r eal, and syst em, and system, elem ent s secur it y reliable, and har m ony unif ied, f ul cont rol var ious against f actor s, achieved t hought no slack, and management no em pty document , and equipm ent no hidden, and syst em no blocked, and unit zer o nonst opped. Qualit y and ef f iciencyqualit y benef it is t o adhere t o t he enter prise survival, pr ofit and developm ent business t rut h, adher e t o t he all act ivit y is econom ic activit y, all cost s can be cont roled, m oney should not be wast e。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。