新版]pec电气工程专业英语证书测验-电气工程专著名词内容摘要:
ermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *alternate sweep A vertical mode of operation for a dualtrace oscilloscope. The signal from the second channel is displayed after the signal from the first channel. Each trace has a plete trace, and the display continues to 电气工程专有名 词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉 强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *alternating current, *ac A current whose instantaneous values reverses in regularly recurring intervals of time and which has alternative positive and negative values, the cycle being repeated continuously. The term is monly used to refer to sinusoidal 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *alternator A machine (generator) for producing alternating currents or 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ALU [see arithmetic logic unit]PEC电气工程专业英语证书考试 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ambient temperature The temperature of the surroundings in which the equipment is used or 电气工程专业英语证书考试 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ammeter An instrument for measuring electric current. PEC电气工程专业英语证书考试 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. � C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ampacity The currentcarrying capacity of conductors or equipment, expressed in 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅 需 *ampere (A) The ampere is the SI unit of current. It is a fundamental unit. It is defined as that constant current which, if maintained in two straight parallel conductors of infinite length, of negligible circular crosssection, and placed 1 meter apart in vacuum, would produce between these conductors a force equal to 2 x 107 newton per meter of length [1948].PEC电气工程专业英语证书考试 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ampere hour capacity The quantity of electricity measured in amperehour which may be delivered by a cell or battery under specified 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *ampereturn (AT) Formerly used as the unit of magomotive force (mmf). It is the product of the number of turns in a coil and the current in amperes which flows through it. [Note: Since turns is not a unit, the SI Unit of mmf is the ampere]PEC电气工程专业英语证书考试 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *amplification Procedure of expanding the strength of a 电气工程专有名 词2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉 强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *amplifier A device or circuit used to increase the power current, and voltage level of a 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *amplitude Maximum or peak value of a quantity or wave varying in an oscillatory manner, measured with respect to the 电气工程专有名词 2PEC电气工程专业英语证书考试 Glossary of Electrical Engineering Terms2A*absolute value Value of an expression without regard to sign or phase angle.*absolute zero The temperature where thermal energy is at minimum. �C or 0 Kelvin.*ac昏湿泽泪犊幽喘旋奈碉符涟豆祸漓催汞匿诡摔涉修唁走旅甲辉强嘉州窍好返蝶瑟歪烯甘蛾缴鹤力糜库撇胯婴镰檬论牵裁熔喜疆队堆竣泊疫阉渴厅需 *amplitude modulation, *AM A proc。新版]pec电气工程专业英语证书测验-电气工程专著名词
相关推荐
,现场设计布置线路走向、配电箱位置等用电设备的安装位置。 因本隆昌县新拱 桥 改造 工程施工组织设计方案 12 工程为线型布置,流水施工,临时用电 从当地电网接入, 并备用一台 200KW发电机发电,以避免临时停电造成停工。 现场移动式开关箱联接线采用绝缘电缆作一机一闸一漏电保护器。 现场室内照明采用 6 平方毫米绝缘双芯导线安装,室外照明采用三线绝缘电缆。 (四) 、堆土场的设置
,寄件网点需要做寄件网点收款登记,确认已收到中心货款。 在“代收款”中的“寄件网点收款登记”中日期可选昨天到今天,状态选“已退寄方”点查询,然后在运单编号处扫描可输入运单号,也可直接 对 选择 处进行勾选 ,这样会选择全部运单,然后点第一 个按扭“确认收款”。 1 寄个件网点在将收到的货款交给业务员收款时,需要在“代收款”中的“货款交业务中登记”菜单中进行登记,打开这个功能后
灌装 机再验证方案 确认人: 日期: 复核人: 日期: 13 再验证周期 对已验证过的设备,若需进行重大的结构改装、主要零部件进行检修或更换、设备用途或工艺条件发生改变,必须进行再验证。 灌装 机再验证方案 附件 1:验证方案培训表 培训日期 培训部门 培训题目 培训地点 培训用时 培训对象 培训内容: 培训人员签名: 姓 名 岗 位 部 门 姓 名 岗 位 部 门 培训评价: 评价人 /日期:
酒精泵 个 1 12 发电机 台 1 新建车站无电源时配 盘营铁路客运专线通信施工作业指导书 17 铁塔架设 专项实施方案 适用于盘营客运专线铁路通信工程 铁塔基础及架设 施工。 2.作业准备: 施工组织设计,阅读、审核施工图纸,澄清有关技术问题,熟悉规范和技术标准。 ,提出应急预案。 对施工人员进行技术交底,对参加施工人员进行上岗前技术培训,考核合格后持证上岗。 3.技术要求:
意见作出。 (五) 由核算员负责保存仲裁记录,仲裁小组成员应在记录上签名。 26 机修厂 管理人员及班组长计分办法 一、采用每天记分制,标准分为本人工资系数,分别为:技术员 1分,核算员、材料员 、培训管理员 分,班长 分,钳工组、电工组、铆焊组组长 分,车工组组长 1 分。 技术员、核算员 、培训管理员 由技术副厂长负责计分,材料员、班长由生产副厂长负责计分,组长由分管班长负责计分。 二
表 水泥技术标准及检验方法 序号 检验项目 技术要求 检验方法 1 比表面积 300~ 350㎡ /kg GB/T8074 2 凝结时间 初凝≥ 45min,终凝≤ 600min GB/T1346 3 安定性 沸煮法合格 GB/T1346 4 强度 详见 GB1752020表 3 GB/T117671 5 烧失量 ≤ %( ) GB/T176 6 游离氧化钙 ≤ % GB/T176