射频工程师测试题内容摘要:
rfectly constant speed into/out of the antenna boresight b) Perfect concentric circle around antenna at constant altitude c) Speeds at integer multiples of antenna rotation rate 7. What does “MTI” stand for? a) Multiple Target Indication b) Mean Time Interval c) Moving Target Indication 8. Synthetic Aperture Radar (SAR) radar is mostly likely to be located on which platform? a) Police car b) Ship c) Airplane 9. Which feature of a “stealth” aircraft is most responsible for its low observability? a) Radar absorbent paint b) Multifaceted surfaces c) Minimal use of metals in airframe 10. What kind of radar did the webmaster of RF Cafe work on while in the ? a) MPN14 b) RDR12 c) NEXRAD RF Quiz 8: Hallmark Decades in Electronics 1. In which decade was the transistor invented? a) 1940s b) 1950s c) 1960s 2. In which decade was the telegraph invented? a) 1810s b) 1840s c) 1870s 3. In which decade was the Inter first implemented? a) 1950s b) 1960s c) 1970s 4. In which decade was the first solid state integrated circuit demonstrated? a) 1950s b) 1960s c) 1970s 5. In which decade were the first successful diode and triode vacuum tubes invented? a) 1880s b) 1890s c) 1900s 6. In which decade was the telephone invented? a) 1850s b) 1860s c) 1870s 7. In which decade was the AEEE (now the IEEE) founded? a) 1880s b) 1910s c) 1940s 8. In which decade with the first transatlantic radio broadcast occur? a) 1880s b) 1890s c) 1900s 9. In which decade was the SPICE simulator introduced? a) 1960s b) 1970s c) 1980s 10. In which decade was the ARRL founded? a) 1910s b) 1920s c) 1930s RF Quiz 9: A Smasbord of RF Topics 1. Where did Bluetooth™ get its name? a) Nobody really knows b) In honor of Harald Bl229。 tand, once king of Denmark c) In honor of its developer, “Big Blue” (IBM) d) From a Muppets characters by the same name 2. Where did ZigBee get its name? a) Nobody really knows b) From the zigzag path of a bee c) Named after the ic strip character, Ziggy d) From the German phrase “sie gabe,“ meaning, “it just works” 3. Who is credited with conceiving of spread spectrum radio munications? a) Dr. Andrew Viterbi b) Qualm c) Actress Hedy Lamarr d) Kinch, the radio operator of Hogan’s Heroes 4. What is meant by the fronttoback ratio of a Yagi antenna? a) The physical size of the front half of the antenna vs. the back half b) The number of driven elements vs. number of director elements c) Power radiated in the front main lobe vs. power in opposite direction d) The weight proportion of the front half of the antenna vs. the back half 5. In an FM modulator with a 10 kHz deviation and a 5 kHz maximum modulating frequency, what is the total occupied bandwidth? a) 10 kHz b) 15 kHz c) 20 kHz d) 30 kHz 6. Which WLAN standard provides the highest data rate? a) ( GHz RF)54Mbps b) ( GHz RF)11Mbps c) ( GHz RF)54Mbps d) ( GHz RF)100Mbps+ 7. Why might the mounting orientation of a surface mount capacitor affect frequency response? a) The plates in the body could be either parallel to or perpendicular to the PCB, affecting coupling b) Adhesion is usually better in one orientation c) Conductive epoxy adhesion is usually better in one orientation d) Orientation makes no difference 8. If you were handed an unprocessed wafer of gallium arsenide (GaAs), silicon (Si), silicongermanium (SiGe), and gallium nitride (GaN), how would you know which is GaN? a) GaN is transparent and the others are not b) The GaN wafer will be noticeably lighter in weight c) The GaN wafer will be much thinner than the others d) It would not be possible to tell the difference 9. The Smith Chart plot of a 50 ohm cable (in a 50 ohm system) spirals inward as the impedance is plotted through multiple cycles. What is that indicative of? a) A lossy cable b) A capacitive cable c) An inductive cable d) The cable is coiled on a spool 10. What are the three primary JEDEC models used for ESD testing? a) High (HHM), Medium (MHM), and Low (LHM) Humidity Model b) High (HVM), Medium (MVM), and Low (LVM) Voltage Model c) Human Body (HBM), Machine (MM), and Charged Device (CDM) Model d) Heidi Klum, Claudia Schiffer, and Gisele B252。 ndchen RF Quiz 10: A Sampling of RF Topics 1. What format would a nearfiled munications (13 MHz variety) antenna most likely take? a) Inductive coil b) Capacitive plate c) Yagi d) Parabolic dish 2. What does SOLT stand for? a) Short Overload Test b) Simple OperationaL Test c) Short, Open, Load, Through d) Strategic Offensive Limitation Talks 3. Which instrument would be best to use to locate a defective waveguide joint? a) Microscope b) Micrometer c) Spectrum Analyzer d) Time Domain Reflectometer 4. Which entity in the . determines whether an RF energyemitting device is allowed to be operated? a) The Federal Communications Commission b) The Amateur Radio Relay League c) The Honor System d) The Underwriter’s Laboratory 5. What does 2G, , 3G, etc., mean in reference to cellphones? a) The average cost of service, expressed in thousands of dollars ($ grand) per year b) The “generation” of the technology c) It is an arbitrary alphanumeric reference code d) The frequency band of operation, in GHz 6. Where would you be likely to find a free wireless Inter connection? a) Hotel Lobby b) Airport c) Your backyard d) All the above 7. Who hosts the MTTS International Microwave Symposium? a) Microwave Journal Magazine b) Microwaves amp。 RF Magazine c) RF Design Magazine d) The Institute of Electrical amp。 Electronics Engineers 8. What is the “rule of thumb” for estimating RF signal propagation distance vs. time in free space? a) 1 millimeter per millisecond b) 1 meter per microsecond c) 1 foot per nanosecond。射频工程师测试题
相关推荐
泥田、潮砂泥田、黄泥田等四个亚类,灌区范围涉及 4 个乡镇。 据 2020年万安县统计资料,总人口 万人,耕地面积 万亩,水稻播种灌溉面积 万亩,粮食总产量 万吨,农作物产值 5501 万元。 灌区范围是我县重点产粮区之一,以农业为主,但农村基础设施的建设薄弱, 农田水利设施建设 标准低、工程不配套、老化破损严重,以及管理体制与运行机制改革滞后, 旱灾频繁。 小农水施工组织设计万安县
去目标小区与小区物业和小区业主委员会沟通 (三) 调查步骤 在完 成调查问卷的设计与制作以及调查人员的培训等相关工作后,即可 开展具体的问卷调查。 ( 1) 首先由组长和两名小组成员去目标的小区与小区沟通,配合物业管理的相关工作,使小组成员可顺利进入小区展开调查。 同时联系小区业主委员会,争取得到他们的帮助与支持。 使调查得以快速有效的实施。 ( 2) 根据小区居民人数
支撑。 “ 信念坚定 ” 是价值所依, “ 为民服务 ” 是使命所在, “ 勤政务实 ” 和 “ 敢于担当 ” 是一贯作风和可贵品质, “ 清正廉洁 ” 是为政底线。 我们应有道路自信、制度自信、理论自信,用坚定的信念指导实践,在工作岗位上勤勤肯肯,为民服务。 情为民所系,权为民所用,利为民所谋。 作为国家公务人员,上有组织信任,下有人民期待,必须牢固站稳和人民的政治立场,摆正自己的位置,做人民
80 年代,设计已为许多国家所关注。 全球化的市场竞争愈演愈烈,为适应世界经济新的动力带来的国际竞争,许多国家和地区都纷纷增大了对设计投入,将设计方在国民经济战略的显要位置。 亚洲四小龙香港、台湾、韩国、新 加坡的经济起飞,正是依靠对设计的巨大投入以及对日本经验的借鉴。 国际经济专家总结亚洲四小龙的成功经验时,将设计归为最重要的决定因素之一。 90 年代的市场竞争明显取决于设计竞争