外文文献及翻译:基于单片机的电子称设计内容摘要:
ductivity. Electronic Scale also has an automatic zero tracking, overload display of selfextinguishing characteristics. Mechanical scales, floor scale / land in the value (car value), weighbridges and other fitted forcesensitive sensors and microputercontrolled intelligent weighing instruments bee intelligent digital electrical and mechanical balance (or the mechanical and electrical dualuse scales), to improve the mechanical balance of the measurement accuracy, with low cost, high reliability, simple installation and so on, without prejudice to the original mechanical scales to any transmission bearing structure. There are peeled, set to zero, the cumulative number of times, the cumulative weight (cumulative amount of valuationbased), autozeroing, autotracking and other functions. Weighing data can be directly printed or transmitted via puter works, industrial processes can improve the level of scale and product quality, trade clearing with the scale can improve the credibility of incalculable social and economic benefits. Electronic Scale is basically a sensor, amplifier circuit, A / D conversion circuit, microcontroller control of display parts, switch matrix circuit, the keyboard circuit and power circuit. Weight sensor signals are converted to a corresponding electrical signal, after amplified into the A / D converted into pulses weight, through the SCM under the control of the analog voltage signals into digital. The digital conversion by the SCM program in line with the actual weight of the value of sending the number of display windows. MCU at the same time the keyboard and switch matrix for monitoring. According to the input parameter values, the program handled accordingly. Power circuit to provide the various parts of the operating voltage. Microprocessor s such as 8050, HD404418F, 8031, etc. CPU. Highly versatile motherboard, different values of range and subdegree scales, just adjust the jumpers on the motherboard and the DIP switch can be achieved, the only difference is that the sensor used with a rated carrying capacity Sensor is a physical device or biological an that can detect and feel the outside of the signal, physical condition (such as light, heat, humidity) or chemical position (such as smoke), and Discovery of information to other devices or ans. Definition of sensor National standard GB766587 sensor is defined as: can feel the requirements are measured and converted in accordance with the laws of certain signal device or devices available, usually posed of sensitive ponents and conversion devices. Sensor is a detection device, can feel the information being measured, and can detect sense of information, according to certain laws of transformation into electrical signals, or other forms of information required for output to mee t the information transmission, processing, storage, display, recording and control requirements. It is the automatic detection and control of the primary link. The role of sensor People in order to obtain information from the outside world must help of sense ans. And rely on people39。 s own sense ans, the study of natural phenomena and laws, and production activities in their functions on far enough. To meet this situation, we need sensors. It can be said sensor is an extension of human senses, also known as electronic features. The arrival of the new technological revolution, the world entered the information age. In the course of the use of information, we must first resolve is to obtain accurate and reliable information, and sensors is to obtain infor mation in the field of natural and production of the main ways and means. In modern industrial production, especially automated production process, the use of various sensors to monitor and control the various parameters of the production process, so that devices work best in the normal state or condition, and to achieve the best quality products. Therefore we can say, without a large number of good sensors, modern production base will be lost. In the basic science research, a more prominent position sensor. The development of modern science and technology into many new areas: for example, thousands of light years to observe the macro level of the vast universe, to observe microscopically small particles cm the world, vertical,。外文文献及翻译:基于单片机的电子称设计
相关推荐
fromthe object. It also returns the results as another object instead of a result set: $query = SELECT * FROM books $result = $connectionquery($query)。 Based on the SQL query, this code calls the
other members. This paper addresses application development in overlay networks. We use the term overlay network programming to refer to the software development process of building application
包单位 负责人 / 分包项目经理 / 序号 检验批部位、区段 施工单位检查评定结果 监理(建设)单位验收结论 1 东墙外墙保温 √ 2 西墙外墙保温 √ 3 北墙外墙保温 √ 4 南墙外墙保温 √ 检 查 结 论 合格 项目专业 技术负责人: 年 月 日 验收结论 监理工程师 (建设单位项目专业技术负责人) 年 月 日 外保温工程涂料饰面层 分项工程质量验收记录 工程名称 地矿家园 7住宅楼
力测试二级、一级考试;二年级学生参加全国计算机等级考试。 3. 根据学校开设选修课的有关规定及学生选课的具体情况确定选修课程的开设。 (二)主要课程说明 1. 课程名称:日语发音与书写 课程编号: 0204501 本课程在学生学习《基础日语》课程的同时,由日本外教小班化教学,进一步逐个纠正学生发音和平假名、片假名书写中存在的问题,使学生从一开始就能学到标准地道的日语语音,并养成良好的日语假名