中英论文翻译对照:全球移动通信系统内容摘要:
. The cell coverage area is controlled by a base station which is itself made up of two elements. The first element is the transmission system which municates out to the mobile and also receives information from it to set up and maintain calls when actually in operation. The base station transceiver (BST) is controlled by the base station controller (BSC), which municates with the mobile switching center (MSC) the essential link to the local public switched telephone work (PSTN), and to the subscriber data which is stored in registers within the system. The subscriber registers allow the GSM system to check a subscriber who requests the use of the work, allow access and then set up the charging function, etc. 6 The GSM system was allocated part of the 900 MHz band at the 1978 World Administration Conference (WAC), the actual bands being 890 to 915 MHz for the uplink transmission and 935 to 960 MHz for the downlink. The access method is time division multiple access (TDMA). The GSM system operates in a burst transmission mode with 124 radio channels in the 900 MHz band, and these bursts can carry different types of information. The first type of information is speech, which is coded at kbit/s or 13 kbit/s. The second type is data, which can be sent at kbit/s, 6 kbit/s or forms of transmission are the useful parts of the transmission, but have to be supported by overhead information which is sent in control channels (CCH). The use of digital radio transmission and the advanced handover algorithms between radi。中英论文翻译对照:全球移动通信系统
相关推荐
椿根皮炭、乌梅炭、石榴皮炭等。 理气类药物炒炭 理气类药物炒炭后理气作用和缓,多用于年老久病、气滞并气虚者。 常用药有:陈皮炭、青皮炭、枳壳炭等。 如青皮所含挥发油有祛痰作用,对气管有较强的松弛作用,对胃肠道有温和刺激作用。 而青皮经炒炭后所含挥发油减少约 80%,故其祛痰、理气作用减弱,药性和 缓。 外用类中药炒炭 常用外用类中药炒炭药物有:地榆炭、干漆炭等。 干漆炒炭后能减低其毒性和刺激性。
断生长发育的过程中,所以无论形体、生理、病理等方面,都与成人有极大的差别,一般小儿的生理特点是脏腑娇嫩、形气未充(全身机能发育未健全),机体生机蓬勃、发育迅速等。 为确保小儿健康发育 ,必须颜格遵守下列用药原则,及服药方法及剂量: 一、用药忌寒辛: 幼儿用药不宜庞杂,在正确的辨证施治基础下,但求精简灵活,并且慎用附子、肉桂、川乌、草乌等大辛大热的药物,或大黄 、黄连、芒硝、山栀等大苦大寒之品。
.................43 十四、现场布置 流程图 及施工进度表 中航商飞 101总部 大楼 及研发中心 基坑支护 SMW工法施 工 组织设计 5 / 45 一、工程概况 .1编制依据 1) 中航商用飞机发动机有限责任公司研发中心建设项目 101 总部及研发大楼基坑支护、降水 、土方 设计方案; 2) 中航商用飞机发动机有限责任公司研发中心建设项目 101 总部及研发大楼基坑支护
of security. They usually react to the last virus or the most recent defacing of their website. But they are trapped in a situation where they do not have the necessary time and( ) to spend on