超声波探伤仪cts-900xpc软件操作手册(中英文内容摘要:

re of model to be installed. and Click Next. 5. Click Next, and it is ready to install. 第 22 页 共 35 页 6. Click Install and the installation starts. Please wait until the installation is pleted. 7. When the installation is pleted, the program will pop up a confirmation window to remind the user that the installation is finished. Click Finish to close the window. 第 23 页 共 35 页 Start the Software Click Start – Program, select SIUI\Client and then click Client to start Client Application. Uninstall the Software Click Start – Program, select SIUI\Client, and then click Uninstall to uninstall Client Application. There is another way to uninstall. Go to Control Panel, and then choose Add/Remove Program to uninstall Client Application. Note: If the user needs to reinstall the software after installation, it is suggested to uninstall it first before reinstallation 第 24 页 共 35 页 Introduction This manual covers PC operation instructions for all models of CTS900X series, such as CTS9009 and CTS9006. Main functions 1) Data File Viewer: To review dataset files saved from the instrument with a USB disk. 2) Cine File Viewer: To view cine files saved from the instrument with a USB disk. 3) Network Bidirectional Communication: To connect the instrument with the work port for reading instrument parameters and wave, and downloading parameter changes back to the instrument. 4) Report Generating Function: To output instrument parameters and wave from dataset files or the work to Microsoft Office Word file. Main Screen Fig. 1 In main screen (Fig. 2): 第 25 页 共 35 页 1) Menu or icon in GRAY means the function is NOT available on this model. 2) Menu or icon in other color means the function is available on this model. Fig. 2 Menu Bar DataFile Open: To open dataset files saved from the instrument with a USB disk. Report Generate report: To output instrument parameters and wave from dataset file or the work to report template file. CineFile Open: To open cine file saved from the instrument with a USB disk. Play: Play cine file Pause: Pause playing Stop: Stop playing 第 26 页 共 35 页 PrevMinute: Jump to the previous minute NextMinute: Jump to the next minute Network Connect: Connect to the instrument Disconnect: Disconnect connection ModifyPara: Modify parameter Freeze: Freeze/Unfreeze the instrument screen Language (语言 ) To select software interface language. Now the languages for selection are: English and Chinese. Toolbar  Open dataset file saved from the instrument with a USB disk. Open cine file which is saved from the instrument with a USB disk. Play cine file Pause: Pause playing Stop:。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。