机构名称:广东出入境检验检疫局检验检疫技术中心轻工实验室内容摘要:
8 Date of Expiry: 20200207 Date of Update: 20200620 APPENDIX 1 SCOPE OF ACCREDITED TESTING № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Primary batteries 〔 1〕 All tests 0414 GB/ Primary batteries Part 1: General EN600861:2020 Primary batteries Part 1: General IEC600861:20207 Primary batteries Part 1: General ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366 第 14 页 共 148 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Primary batteries 〔 2〕 All tests 0414 GB/T —2020 Primary batteries Part 2:Physical and technological specifications EN600862:2020 Primary batteries Part 2: Physical and electrical specifications IEC600862:2020 Primary batteries Part 2: Physical and electrical specifications 〔 3〕 All tests 0414 Primary batteries—Part 4:Safety of lithium batteries IEC600864:2020 Primary batteries – Part 4: Safety of lithium batteries EN600864:2020 Primary batteries – Part 4: Safety of lithium batteries ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366 第 15 页 共 148 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Primary batteries 〔 4〕 All tests 0414 Primary batteries—Part 5:Safety of batteries with aqueous electrolyte IEC600865: 2020 Primary batteries—Part 5:Safety of batteries with aqueous electrolyte EN600865: 2020 Primary batteries—Part 5:Safety of batteries with aqueous electrolyte 2 Lithium batteries 〔 1〕 All tests 0414 UN DOT The fivth revised edition of the Remendations on the Transport of Dangerous Goods, Manual of Test and Criteria (2) Content of Lithium 0244 The special provisions 188 of Chapter of the sixteenth revised edition of Remendations on the Transport of Dangerous Goods, Model Regulations (3) Watthour rating 0414 ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366 第 16 页 共 148 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 2 Lithium batteries (4) drop test 0329 The special provisions 188 of Chapter of the sixteenth revised edition of Remendations on the Transport of Dangerous Goods, Model Regulations (5) All tests 0414 IEC 62281:2020 Safety of primary and secondary lithium cells and batteries during transportEN62281:2004Safety of primary and secondary lithium cells and batteries during transport 0414 GB21966- 2020 Safety of primary and secondary lithium cells and batteries during transport ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366 第 17 页 共 148 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 2 Lithium batteries (6) Designation and marking 0414 IEC61960:2020 Secondary cells and batteries containing alkaline or other nonacid electrolytes Secondary lithium cells and batteries for portable applications EN61960:2020 Secondary cells and batteries containing alkaline or other nonacid electrolytes Secondary lithium cells and batteries for portable applications (7) 20℃ Discharge performance (8) High rate discharge performance at 20℃ (9) Charge (capacity) retention and recovery ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366 第 18 页 共 148 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 2 Lithium batteries (10) Charge (capacity) recovery after long term storage 0414 IEC61960:2020 Secondary cells and batteries containing alkaline or other nonacid electrolytes Secondary lithium cells and batteries for portable applications EN61960:2020 Secondary cells and batteries containing alkaline or other nonacid electrolytes Secondary lithium cells and batteries for portable applications (11) Endurance in cycles (12) All tests 0414 GB/T182872020 General specification of lithiumion battery for cellular phone (13) part of test 0414 QC/T7432020 Lithiumion batteries for electric vehicles Except for: acupuncture (14) All tests 0414 UL16422020 Lithium batteries ISO/IEC 17025 认可证书 CNASPD19/06A/3 No. CNAS L0366。机构名称:广东出入境检验检疫局检验检疫技术中心轻工实验室
相关推荐
废钢材,准备进行渣土外运和后续地下清障工作。 烟囱南侧 烟囱北侧 杨厂后续开发项目公共空间烟囱倒伏影响区域建构筑拆除工程 长臂液压剪拆除 现场照片 澄清池和清水池及其附属小池的拆除方法: 1) 、澄清池和清水池概况: 澄清池和清水池 位于整个工地的南侧,一共有两座,大小尺寸均一样。 浓缩池外形为圆形,直径在 米,地面以上高度在6米左右,地下部分位于地面以下 米左右,中心圆柱的基础深度在 米。
发现违法事实 审 查 制作笔录、 抽样取证等 调查取证 ( 2人以上) 处罚前告知 组织听证(情节复杂或重大处罚) 登记保全( 7日内决定) 听取陈述 申 辩 集体讨论 决 定 送 达 执 行 立(受)案 进入行政复议或诉讼流程 复议决定或行政判(裁)决 听证权利告知 告知时间、地点 听证主持人主持听证 当事人质证辩论 制作听证笔录 不予处罚 移送司法机关 需给予纪律处分的,报告有管理权的机关
、油脂装置在一起,长时间放置在盒子里。 2) 铸铁管 安装 ① 首先测量放样,放出管道中心线,设置里程和高程控制点。 ② 管道安装在沟槽地基,管基检验合格后槽内杂物清除干净后进行。 3)下管前进行铸铁检查,管表不得有裂纹,检查方法采用小锤轻轻敲击管口、管身,破裂的管子处发声嘶哑,表明此管不能用,对于凹凸不平妨碍使用的缺陷,承口内部插口端部的沥青以及飞刺和铸砂用砂轮磨掉,或用錾剔除。 4)下管时
..................... 55 第十二章 裱糊工程 ......................................................................................................................... 63 第十三间 脚手架工程 ............................
书》、余泥渣土运输与排放方案、《投标文件编制人员名单》、投标报价文件八个部分 组成。 资格审查文件主要包括的内容: ( 1)法定代表人证明书,如投标文件为委托代理人签署应同时附上法定代表人证明书和法定代表人授权书。 ( 2)企业资质证书; ( 3)投标报价与企业注册资本金的比例满足《建筑业企业资质管理规定》(中华人民共和国建设部令 159 号)的规定,投标报价以《广州建设工程施工招标投标书》为准