土木工程文献翻译18000字内容摘要:
ility is a process, and if this process in providing the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, MillerFeiqieer, Fenner Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to consider the ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects. Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attention to the process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representation method. 2. NATM NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles. NATM concept of filibustering Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete bination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and theoretical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have bee modern tunnels new technologies landmark. Nearly 40 years ago, the railway sector 河南理工大学本科设计毕业论文 14 through research, design, construction bining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM of only 50%. Currently, the New Austrian Tunneling Method almost bee weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : ( 1) . Rock tunnel structure is the main loading unit, the construction must fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To this end, the construction of subsection should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling. ( 2) . In order to give full play to rock the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring。 The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock close to, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supporting structural strength, Stiffness and its participation in the work of the time (including the closure of time) to control the deformation of the rock mass. ( 3) . In order to improve the support structure, the mechanical properties, the construction should be closed as soon as possible, and to bee a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to avoid the corner of the stress concentration. ( 4) . Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedures, changes in the design and construction management of the daytoday. 河南理工大学本科设计毕业论文 15 ( 5) . To lay waterproof layer, or is subject to bolt corrosion, deterioration of rock properties, rheological, swelling caused by the followup to load, use posite lining. ( 6) . Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting structure into a whole, thereby improving the support system of security. NATM above the basic elements can be briefly summarized as : less disturbance, early spray anchor, ground measurements, closed tight. 3. With a spring to understand the principle NATM ( 1) . Cavern brink of a point A in the original excavation ago with stress (stress selfrespect and tectonic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under pression in a state of equilibrium. ( 2) . Cavern excavation, A point in attacking lose face constraints, the original stress state to be adjusted, if the intensity of rock big enough, After less stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of the poor, that is, after the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support power PE, in order to prevent landslides instability. Equivalent to the Spring of deformation u, in the role of PE is now in the midst of a state of equilibrium. ( 3) . By the mechanical balance equation, we can see in the spring P0 role in a state of equilibrium。 Spring in the event of deformation u, PE in the role they will be in equilibrium, assuming spring elasticity of K, were : P0=PE+Ku Discussion : (1) When u = 0, that is not allowed P0=PE rock deformation, is a rigid support, not economic。 (2) when u ↑, PE ↓。 When u ↓, PE ↑. That is, rock deformation occurred, the release of some of the load (unloading), we should allow some ext。土木工程文献翻译18000字
相关推荐
天)满后 5 日内退还(不计利息),退还投标保证金和(预交)施工履约保证金一律采用转 账 方式汇至投标人 账户 ;投标人已中标的,投 标保证金于签订合同之日起十日内退还,同样采用转 账 方式汇至中标人 账户 ,(预交)施工履约保证金即转为施工履约保证金,由长沙县招标采购中心转汇至招标人 账户 ;投标人开标后撤出投标或者中标后拒绝签订合同的,所交投标保证金不予退还。 招标人拒绝签订合同的
考 项 目 铁 Fe 硫 离 子 S2– 铵 离 子 + 离 子 状 二 氧 化 硅 SiO mgFe/L mgS2–/L mg + /L mgSiO /L < 检 验 不出 < < 50 < 检 验 不出 < JB/T 8055- 96 表 7 mm j) 机 组组装 时 , 各零、部件应保持清洁,不应有油污、铁 屑 、 锈 垢 、 焊 渣 等 存 在 , 并 应 进 行 脱 脂 和 去 除
选择地质条件、断面形式均具代表性的地段,长度为 120m 的试验段施工,通过试验确定不同机具压实 不同填料的最佳含水量,适宜的松铺厚度和相应碾压遍数,最佳机具组合和施工组织。 ㈡ 表层土清除 采用推土机、挖掘机与自卸汽车配合,挖除地表种植土,运至指定的弃土堆放区。 ㈢ 基底处理 对清除表层土的地面用核子密度仪测定地基土层的密实度和含水量,判定地基 16 土的承载力情况,并将试验报告监理工程师审查
测量资料经自检、监理检查无误 复核内业计算资料, 在施工测量放线报验单上签署批复意见 4 设置 GPS基准站,落实电源、电瓶等事宜,填报验单向监理工程师申报验收。 GPS基准站坐标通过监理工程师审查 旁站 GPS基准站设置,检查基准点坐标输入是否正确,检查电源、电瓶的落实情况,批准基站验收 5 对基点进行检查,定期校核,变化较大时报监理工程师修正坐标 基线点通过验收 检查督促基点测量校核
工期的工序和作业环节给予人力和物力的充分保证,确保总进度计划的顺利完成。 ( 2)在工程开工前,严格按照《工程施工承包合同》的总工期要求,提出工程施工总进度计划,并对其是否科学、合理,能否满足合同规定工期要求等问题,进行认真审 查。 ( 3)成立由生产副经理为主,工程部门、作业队负责人组成的生产指挥调度室,加强施工现场的协调和领导。 定期召开生产调度会议,作业队每天安排一次生产会
工前,应实测开挖区的原始断面图或地形图。 2)在开挖施工过程中,应经常在开挖面或其他适当部位以醒目的标志标明桩号高程和开挖轮廓线。 3)开挖部位接近完工时应及时测放基础轮廓点及散点高程并将欠挖部位及尺寸标于实地。 开挖工程结束后,应实测开挖断面图。 2 立模与填筑过程测量控制 1) 选择放样方法时应考虑检核条件,没有检核条件 的方法,必须在放样后采用另外的方法进行检查。 2)