北京市房屋建筑修缮及装修工程施工合同甲种本内容摘要:

er t han 1 t on less t han 10 t ons of weight lif t ing, hoisting, appr oved by t he wor kshop, equipm ent M anagem ent Depar tm ent f or appr oval. ( C) of over 10 t ons and heavy lif t ing oper ations pr oj ect s or constr uct ion under t he special condit ions, shal pr epar e lif t ing plan, per mit t o wor k submit t ed t o pany exec utives and saf et y equipm ent, t he j oint securit y sect or r eview pet ent aft er Assist ant Gener al M anager appr oval. Four , lif t ing saf et y r equir em ents 1. lif t ing weight s gr eat er t han or equal t o 10 t onnes of t he obj ect and t he subject of civil engineer ing st r uctur es, hoist ing const ruction plan shall be pr epar ed. Load is less t han 10 t onnes, but small plex shapes, st if f ness, lengt h diam et er r at io, pr ecision pr ecious, under t he special condit ions of const r uct ion, should also pr epar e constr uction pr ogr amm es. Hoisting const ruction pr ogr am mes exam ined by t he pr oj ect aut hor it ies, submit t ed t o t he pet ent VP appr oval t o be im plem ent ed. 2. lif t ing oper at ions m ust set up t he aler t line and set up special car e, guar dianship per sonnel m ust wear ar m bands, lif t ing r eg ional st aff out of bounds。 3. lif t ing oper ations m ust be pr ovided f or lif t ing loads, slings, r igging and econom ic calculat ion options, do not overload. When lif t ing heavy obj ect s close t o or r each t he r at ed lif t ing capacit y, check br akes, low height , shor t str oke af t er t he load t est, hen sm oot hly lif t ed. Lar ge and m edium sized equipm ent bef or e lif t ing, load t est should be car r ied out . Tr y hanging height f or about 0. 2m and t hen conduct a r eliabilt y check ( including t he select ion and calculat ion of saf ety f actor ). Overload lif t ing is st r ict ly pr ohibit ed. 4. bef or e lif t ing m ust pad t he wood and t he wood used must be of adequat e size ( be sure t o over 1 m)。 when lif t ing r equir es f ir e escape, you m ust cont act t he cir cuit br eaker in accordance wit h t he pr ovisions。 5. lif t ing oper at ions must be r un on all kinds of hoist ing m achiner y par ts, saf et y devices as well as slings, r igging a det ailed secur it y checks, securit y devices f or lif t ing equipm ent is sensit ive and r eliable, no ilness. M ust r y befor e lif t ing cr ane, confir med bef ore t hey can wor k. 6. lif t ing oper at ions, r emoved plat f or m guardr ail m ust be r estor ed (t he bolt activit y f ence rem oval is st r ict ly pr ohibit ed)。 7. lif t ing oper at ions, should have adequat e light ing at night , out door . . . 16, lif t ing t he appr oval pr ocedur e is not plet e, secur it y m easur es ar e not (贴印花税票处) 根据京国土房管房字[ 2020] 767 号文规定 ,本合同文本 (甲种本 )适用于在本市行政区域内工程造价在 150 万元以上的,已验收并交付使用的各类房屋建筑物、构筑物及其附属设备的修缮、养护、加固、拆改、翻建、安装;按传统作法的文物古建筑的修缮、复建、迁建等,以及随同上述各项工程同时进行的装修工程或单纯进行二次或多次装修工程,但属原工程保修范围的内容及家庭居室装修工程除外。 blind Boar d oper ational secur it y r equir em ent s 1. blocking blind Boar d oper at ions r equir ed t o handle blocking blind Boar d oper ating license, no blocking blind Boar d oper at ing license ar e not allowed t o sm oke blocking blind Boar d oper at ions. 2. it is st r ict ly pr ohibit ed t o alt er , lent t he blocking blind Boar d oper at ing license. Cont ent conver sion and expansion of oper ations or t r ansf er j obs it e, again f or blocking blind Boar d oper at ing license. 3. in plet e j ob appr oval pr ocedures, saf et y m easures ar e not im plem ent ed, wor k envir onm ent does not m eet secur it y r equir em ent s, wor ker s have t he r ight t o r ef use t o wor k. 4. t oxic gas piping, equipm ent blocking blind Boar d, nonir r it ant gas pr essur e should be less t han 200 mm Hg。 ir r it ant gas pr essur e should be less t han 50 m m Hg。 gas t em per at ur e should be less t han 60 degr ees. 5. Technical Depar t m ent r esponsible f or dr awing blind locat ion m ap, num ber s t he blind, const r uction per sonnel wor k, blind locat ion m ap by t echnology ar chive f or f utur e r ef erence. 6. t he blind plug oper at ing per sonnel m ust wear appr opriat e per sonal pr ot ective equipm ent, m ust designat e a per son r esponsible f or blocking blind Boar d wor k, and t o designat e a per son r esponsible f or m onit oring. Guar dians ar e advised by experienced of icer s. ,Guar dian j obs people m ust wear appr opriat e pr ot ective equipm ent as r equir ed, and guar dians m ust check, im plem ent ing r elevant safet y m easur es on t he j ob. Guar dians m ust adher e t o t he scene, and em ergency t r eat m ent. J ob guar dian shall not leave t he j ob sit e bef or e t he end. 7. t he j ob plicat ed, danger ous places, apart f r om t he guar dian, also pany leader ship, saf et y and Envir onm ent Depar tm ent , is r esponsible f or per sonnel. I nvolving t he ent ir e pr oduct ion system, head of t he t echnical depar tm ent m ust be pr esent . 8. in places wher e inf lam m able and explosive wor k, place wit hin 30 m et r es wit hout hot wor k oper ations。 t ask light ing should use explosion proof lam ps and explosion pr oof t ools should be used, pr ohibit ion of beat ing wit h an ir on pipe, f lange, et c. 9. high blocking blind Boar d oper at ion shal f olow t he pr ovisions of license f or wor king at height . 10. const r uction unit t o blind a lot accor ding t o t he r equir em ents of t he per mit t o wor k, t he im plem entat ion of saf ety m easur es, wor k can be car ried out . 11. is s t r ictly pr ohibit ed on t he same pipe sim ult aneously in t wo places and t wo or m or e blocking blind Boar d oper ations. When plugging m ult iple blind, blind t o blind locat ion m ap and plat es num ber by constr uction Gener al M anager , unit y of mand assignments. 12. signs in each blocking blin。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。