高三英语省略句内容摘要:

r). •I will buy a house. He will (buy a house) too. 1)省略动词 + 宾语或补语 •John was the winner in1994, and Bob (was the winner) in 1995. 2)省略主语 + 谓语动词 We still have shortings, and (we have) very big ones, too. 出现在并列句中的 be,have,do,如果在一个分句中作助动词,而在另一个分句中作行为动词,不可省略 •The man has a gun and has threatened to use it. •Mary did the work but did not finish it. 3) 省略主语 + 谓语 + 宾语 •They have increased trade with China and (they have increased trade) with other EastAsian countries, too. • They tried to prevent the pollution, but (they did) not (prevent pollution) very successfully at the beg。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。