高三英语宾语从句内容摘要:
2. He says, “Tom is a good student ”. He said that I was younger than him. He says that Tom is a good student. 直接引语变间接引语与宾语从句的关系 一般疑问句变为 if (whether)引导的宾语从句 . 1. She said, “ Do you often e here to read newspaper? ” 2. “Will they go to visit the Great Wall?” he asked. She asked if (whether) I often came here to read newspaper. He asked if (whether) they would go visit the Great Wall. 直接引语变间接引语与宾语从句的关系 特殊疑问句变为 who, what, when等引导的宾语从句 . 1. He asked, “Where do you live?” 2. “How can we get to the postoffice?” he asked. He asked where I lived. He asked how they could get to the postoffice. 直接引语变间接引语与宾语从句的关系 当主句的谓语动词是一般现在时或一般将来时,宾语 从句的谓语动词可以用所需要的任何一种时态。 当主句的谓语动词是一般过去时,宾语从句的谓语 动词要用相应的过去时态,但当宾语从句叙述的内容 为客观真理时,仍然用一般现在时。 . The teacher said that the moon moves around the sun. 注 意: 1. The radio says it _________ cloudy tomorrow. (be) 2. The headmaster。高三英语宾语从句
相关推荐
Part 2 根据主题安排段落 构思 3整合要点 不文明行为 英语学习 奥运精神 其他做法 Part 1 根据段落安排, 确定段落主 题句。 A lot of things can be done to make preparations. 构思 3整合要点 不文明行为 英语学习 奥运精神 其他做法 Part 1 改正 加强 学习 宣传 根据段落主题句,丰富、完善和 合理安排要点。 构思
ent happen? Where was it that you put my English dictionary? • 四、区分定语从句和强调句型某些定语从句和强调句型形式差不多,容易混淆。 如果去掉 it is/ was ... that句子仍然通顺成立,则为强调句型,不成立不通顺,则为定语从句。 . It was three years ago that he went to
方式副词,短的在前,长的在后,并用 and或 but等连词连接。 Please write slowly and carefully. 3) 多个不同副词排列:程度 +地点 +方式 +时间副词 • 注意:副词 very 可以修饰形容词,但不能修饰动词。 改错: (错 ) I very like English. (对 ) I like English very much. • 注意:副词
first lesson that I learned will never be fotten. This is the highest mountain that we have climbed. 先行词被序数词或形容词最高级修饰 • 5. Who is the man that is talking to John. • 当句中已有 who时,为避免重复 • 只用 which不用
• Soon the rushhour crowds began to notice. What a wonder! There, 1350 feet above the street, a ____ figure was walking on air. • A. great B. strange • C. public D. tiny 解题方法探讨 • NMET 96’ 27 • When
al and caused me some unfortable moments. Maybe it was the strange 1 things looked and sounded in my familiar room at night that 2 me so much. (A) 1. A. way B. time C. place D. reason 题解 : i.