高一英语下学期完全倒装内容摘要:

y got to the plant than they started to work. = Never have I seen such a man. ( often, always, once, many a time, so+adj/adv., thus, now and again, every other day, ect.) Often had I intended to speak of it. Many a time has he helped me with experiment. So fast does light travel that it is difficult for us to imagine its speed. So busy is he that he has no time to spare. Thus was the Emperor deceived. = He is so busy that he has not time to spare. = The Emperor was thus deceived. only及其修饰的状语放在句首时 Only then did I realize the importance of English. Only when the war was over in 1918 was he able to get happily back to work. = I realized the importance of English only then. = He was able to get happ。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。