高一英语doing内容摘要:

看见他正在上楼。 I saw him going upstairs. 我们看着她在过大街。 We watched her crossing the street. 我们听见她在房间里唱歌。 We heard her singing in her room。 全析提示: 接现在分析作宾语补足语的动词有feel, hear, listen to, see, look at, watch, observe, notice, find, smell, set, have, keep, start, leave, get catch等。 1. The ______ boy was last seen ______ near the bank of the lake. A. missing。 playing B. missing。 play C. missed。 played D. missed。 to play 解析: missing是形容词,作 boy的定语,意思是 “ 失踪的 ”。 was last seen playing表示被看见时正在玩。 高考链接 2. Mr Smith, ______ of the ______ speech, started to read a novel. A. tired。 boring B. tiring。 bored C. tired。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。