高三英语语法:强调句型内容摘要:

It was because +从句 +that+ It was because of +名词 +that + It was +介词 +时间点 /时间段 +that+ :把强调结构 “ it is /was ++that 去掉,若句子仍然成立,就是强调句,否则不是 . eg: ⑴ It is the true that he once went to America.(不是强调句型) ⑵ It was at 8 o’clock that he came back. :强调句型的答语也应是强调句型。 —— Was it you that told him about it? —— Yes, it was (不用 I did) 引导的强调句不能用来强调条件状语从句和让步状语从句,可强调 because 引导的原因状语从句,却不能强调 as/since 引导的原因状语 从句,可强调 so that 引导的目的状语从句 ,却不能强调 so that 引导的结果状语从句。 Practice biggest problem of Chinese farmers is the shortage of arable land. It is the shortage of arable land that is the biggest problem for Chinese farmers. plant grown in greenhouses are protected from the wind, rain and insects. It is the plants grown in greenhouses that are protected from the wind, rain and insects. agricultures should depend on high technology as well as traditional methods.。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。