高三英语完型填空第三讲内容摘要:

else. (NMET04 全国 1) 46. A. luck B. story C. work D. joy 47. A. However B. Therefore C. As for him D. Except for that 词汇 +语境 ——C Tip 1——词汇 : 词汇语境 : 解题方法 : 想象事件情节 寻找相关词汇 (重述、转述、反述、解释 ) (同义词、近义词、反义词 ) 关注句式结构 (对比、平行、排比) 辨别代词指向 事件跳跃 确定相关人物 (动作发出、承受者、 职业、身份) 1. …(I quarreled with the woman.) Then one day,I thought, “What can I do?” I soon found an answer. The next day the woman (32) a note on her windshield(车的挡风玻璃 )… (NMET 05全国 3) 32. A. put B. wrote C. sent D. discovered 词汇 +语境 ——D 2. You (a war reporter) are standing in front of a (37) and you are telling the TV (38) what is happening. (NMET 05湖北 ) 37. A. crowd B. house C. battlefield D. camera 38. A. produce B. viewers C. directors D. actors 词汇 +语境 ——D The owner continued,“He (the detective) came into the kitchen and showed me a photo of the wanted man. I (52) say。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。