高三英语名词内容摘要:

experience靠经验 an experience一次经历 youth青春 a youth一个青年人 have pity on a pity可惜的事情 with pleasure乐意 a pleasure乐事 2. 抽象名词与 a(an)连用,淡化了抽象概念,转化为似乎可以体验到的动作、行为或类别。 如: A knowledge of English is a must in international trade. Would you like to have a walk (swim, bath, talk) with me? It is a waste of time reading such a novel. She made an apology to her mother for her wrong doings. 3. 物质名词有前置定语修饰时,前面要使用不定冠词。 have breakfast have a wonderful breakfast The road is covered with snow. They have a heavy snow every year. Time and tide wait for no man. We had a wonderful time last night. 有复数形式的不可数名词 ①有些抽象名词往往以复数形式出现,起到一种丰富语言感情色彩或强调某种特殊状态的作用。 如: Use your brains, please. They have smoothed away the difficulties. Have you made preparations for tomorrow’s meeting? Many thanks for your kindness. No pains,。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。