高三英语上学期宾语补语内容摘要:
as heard to sing many English songs. I heard her sing many English songs. 3. 分词(短语)作宾语补足语时,若表示宾语与补足语之间是 主动关系 ,则用 现在分词 ;若表示宾语与补足语之间是 被动关系 ,则用 过去分词。 eg. I saw the old man knocked down by a car. I saw the train ing into the station. 4. 感官动词用不带 to的 不定式 作宾语补足语,表示 动作的全过程 ;用 现在分词 作宾语补足语,表示 动作正在进行。 eg. I saw him cross the street. I saw him crossing the street. 5. 某些过去分词如 seated, hidden, dressed, disappointed等,由于源自系表结构,故一般不用它们的现在分词形式作宾补。 eg. I foun。高三英语上学期宾语补语
相关推荐
he period between children and adulthood. A 少儿期 B 幼儿期 C 青春期 D 成人期 2). The herdsman, who looks after sheep, earns about 650 yuan a month. A . keeper of a group of animals, esp. cattle B . a butcher C
e newspapers carried this important news. 60. He expressed his satisfaction with the result and added he would work harder. 我想我们现在应该为下一次会议定个日期。 我想我们应该在做任何其他事情之前认真考虑此事。 I think we ought to consider
.having made 状语 He spoke loudly (so as /in order) to be heard . I’m too tired to walk any further this afternoon . They jumped with joy to hear the news . He raised his hand as if to take off his hat
en separated from other Continents for millions of years.. 2. Why do kangaroos carry their young in a pocket of skin on their stomach? Kangaroos give birth to very small and weak young. They are