高三英语英语长句、难句集锦内容摘要:

advanced program of studies to excellent students who were invited and able to take it . 当一所私立学校关门的时候,一些有识之士认为,公立学校系统应该接管这所学校并将其用于培养才智高的学生;这些人士还主张,该校应该规定若干入学要求,为既有兴趣而接受能力又强的学生提供高标准的教学大纲。 never operated a puter, met with a lot of difficulties at first. 约翰逊先生从未操作过计算机,所以最初遇到了许多困难。 fewer than 20 years ago,it has already bee one of the greatest things of the 70yearold electronics. 尽管发明还不到 20年,可是它已成为已有 70年历史的电子学领域的一个壮举。 flights having been canceled because of the snowstorm,many passengers could do nothing but take the train. 由于所有航班都因暴风雪而取消,许多旅客只好改乘火车。 very short of money and wanting to do something useful,I applied,fearing as I did so,that without a degree and with no experience in teaching,my chances of getting the job were little. 我因手头很拮据,同时也想干点有用的事,于是便提出了申请,但在提出申请的同时我也担心,自己一无学位,二无教学经验,得到这份工作的可能性是微乎其微。 he had saved $50,which some Hening people living in Chicago,who were back home visiting,had assured him was enough to see him eat and sleep lon。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。