高考英语开放性作文内容摘要:

I were playing happily in the woods. We were playing balls and suddenly the ball ran into the other side of the road. I hurried to get it when I saw a bird lying there and I found it was wounded. We quickly took it to the hospital and the doctor gave the bird some medicine and we took it back home then. It was getting better and better and we decided to set it free the next day. 主次不分 •例 6: • Wang Ping told me that he was a little hungry and we could eat the bird. I greed with him and we found some dry wood and put it together. Then we cooked the bird. It was really delicious. What a happy day. 思想不够积极 •认真 审题 ,即:审 语境、审人称、审时态 • 要紧扣主题 , 符合要求 , 首尾呼应 • 注意写作对象和语言风格 , 要有读者的意识 • 要进行细致描写 , 有细节的支撑 • 要有主次之分 , 详略得当 • 要力求内容新颖 , 必须符合逻辑 • 要做到思想健康 , 积极向上 Thinking that it might die without treatment, we took it home. I made a little nest for it and gave it some r。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。