高考英语分词的时态与语态内容摘要:
t setting D. to be set 3. The house ____ now is our library. A. repaired B. being repaired C. to be repaired D. which is repaired 4. —Who is the man talking to our headmaster? —A professor ___ a visit to our school. A. pays B. is paying C. paid D. paying was a terrible noise_______the sudden burst of light. A. followed B. following C. to be followed followed 、 ___ boys were last seen____ near the river. A. missing。 playing B. missing。 play C. missed。 played D. missed。 to play 7. Mr. Smith, ___of the ___speech, started to read a novel. (NMET2020) A. tired。 boring B. tiring。 bored C. tired。 bored D. tiring。 boring 、 8. The picture ___on the wall is painted by my nephew. A. having hung B. hanging C. hangs D. being hung left the book________where he had found it. A. lain B. lying C. laying D. lay 10. Reading is an experience quite different from watching TV。 there。高考英语分词的时态与语态
相关推荐
oney having fun this week, better ___ it you39。 ve got some big bills ing. A. fet B. fot C. fetting D. to fet 2. I don39。 t think I39。 ll need any money but I39。 ll bring some ___. A. at last B. in
It looks __________ it is going to rain. as if/though 同位语从句 跟在某些名词后面,对该名词作进一步解释说明。 常用名词有 belief, fact, idea, hope, news, doubt, result, thought, information, opinion等等。 Suggestion, order demand wish等
in a heavy rain. 他们淋了一场大雨。 It’s a great pleasure to have a talk with you. 3. 用于专有名词之前表示类似的一个或某一个。 (some) A Mr. Li is asking to see you at the school。 如: ( 1) have a
标题 2. 概括 [关于所读的短文的梗概 (约 30词 )] 3. 过渡句 4. 记叙文 (关于同一主题的 ) [按题目内容要求 ] 5. 结束语 [点题 ] The whole story Why Cut School? This article points out a mon phenomenon playing truancy among students. It also gives