高三英语findinginformationaboutalegendaryperson课件内容摘要:

presents. Steve: He is often described as a happy, fat man with long white hair and a long white beard and moustache, dressed in a red suit with a black belt and black boots. However, he hasn’t always dressed like that. A famous advertisement used a picture of him wearing red in nieen thirtyone, but before that, he was usually drawn wearing green. Host: Steve: Father Christmas es to visit us at Christmas time, but where does he spend the rest of the year? Well, he is said to live near the North Pole with his wife and lots of little creatures called elves. The elves are his friends. They help make toys. He also has twelve reindeer that help him deliver the presents on Christmas Eve. Listening text 2 Host: When I was a child, I used to write to Father Christmas, so that he would know what I wanted. Many children do that several months before Christmas. They write to tell him what presents they would like for Christmas. One of the traditions in the UK is for children to take the list of presents they want and put it in the chimney. What happens after that, on Christmas Eve? Steve: Host:。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。