高三英语词汇归类总复习内容摘要:

89高考) Do you know the boy ____under the big tree?  The woman, who was born in 1940,has borne five children. 二、从搭配上复习归纳词汇,过习语关  英语词汇的搭配十分活跃,复习时我们要把重点放在某些常用的动词、名词 或介词、副词。 我们可按下列 方式进行对比归纳。  常用的搭配较活跃的名词有: time, way, moment, means等。 如 time的搭配短语在中学教材中出现有: in no time(立刻,马上),  on time(按时),  in time(及时、迟早),  at a time(一次),  behind the times(落伍),  behind time(不及时,晚点)  , at one time(曾经), for a time(一度),  at other times(其它时候,平素)  at times (有时候),  at all times(一直,经常) ( 93高考) If you keep on, you will succeed_____________. A. in time B at on time ─────  C. on time the same time  ( 94高考) Don39。 t all speak at once!__,please.  at on time by one time for each time at a time ────────  常用的搭配活跃的动词有: look, take, make, give, get, have, go, do, turn, put, set, e等。 复习时我们要 尽量将具有相反意义的介词、副词与同一动词的搭配罗列在一起对比记忆,如 turn一词: turn on(打开),  turn off(关上),  turn up(放大音量等;出现),  turn down (放小音量等;拒绝) ,  turn in(上交),  turn against(反对),  turn out (生产),  turn away(避开)  ( 81高考) Would you mind ____your radio a little?  A. turn off B. turning off C. to turn down D. turning down ( 92高考) Readers can ___quite well without knowing the exact meaning of each word. A. get over B. get out of  C. get along D. get off 、副词  搭配活跃的介词、副词有: in, out, up, down, on, off, to, from, for, over, with 等。 复习时,我们要从不同动 词、名词等与同一介词、副词搭配进行逐一过关, 如 on的搭配有: ① on与动词的搭配 get on(上车/船等),  live on(以 …为生),  feed on(以 …为生),  take on (接受;雇用), turn on  look on(旁观)  spy on(侦 察/窥探),  call on(号召;拜访)  go on(继续 )  have on(穿戴),  depend on(依靠),  wait on(侍候), carry on(执行),  hold on(坚持), insi st on (坚持), play tricks on(戏弄), fix on(注视), impress on(留下印象)  ② on与名词搭配(注意冠词的取舍)  on duty(值班),  on business(因公;因事),  on fire(燃烧), on show (展览),  on time(准时) , on strike(罢工),  on watch(监视,观察), on sale(出售;大减价), on earth(到底,究竟),。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。