高一英语上学期期末复习题内容摘要:
rry B. carrying C. with carrying D. carried 43. He had a hard time ______ up this morning and had little time_____ breakfast. A. getting。 having B. to get。 to have C. getting。 to have D. to get。 having 44. I couldn’t help but ______ her the news, and hearing the news she couldn’t help_____. A. tell。 cry B. to tell。 to cry C. telling。 crying D. tell。 crying 45. ______ the room, he found many books _____ on the floor. A. Enter。 lie B. Entering。 laying C. To enter。 lying D. Entering。 lying 46. He regretted ______ the doctor’s advice. A. not having followed B. having not followed C. not to follow D. not have followed 47. China succeeded in launching a manned spacecraft to space, _____ it the third country in the world that has such technology. A. making B. to make C. made D. make 48. What’s made you so unhappy? ____ three tickets to the pop music concert. A. Lost B. losing C. Because of losing D. Since I lost 49. The boy used to _____ by his father, and now he is not used to ___ by his father. A. be scolded。 be praised B. being scolded。 being praised C. be scolded。 being praised D. being scolded。 be praised 50. There is no need ____ with him. He won’t listen to you. A. to argue B. argue C. arguing D. argued 51. The bird was lucky enough to miss _____. A. catching B. being caught C. to catch D. to be caught 52. He’s considered ____ a poor teacher and he’s considering ____ his job. A. to be。 to quit B. being。 quitting C. being。 to quit D. to be。 quitting 53. Don’t fet _____ English during the summer holidays. A. to practice speaking B. to practice to speak C. practicing speaking D. practicing to speak 54. We were lucky that we just escaped ____ the rain. A. being caught in B. to catch C. to be caught in D. catching 55. With all the taps _____, how much water are you wasting a day? A. run B. running C. ran D. runs 56. ____ enough preparations, they thought it better to put off the meeting. A. Not having made B. Having not made C. Not making D. Not to have made 57. Do you remember _____me somewhere before? meet B. met C. meeting D. meet 58. ____ the meeting himself gave them a great deal of encouragement . A. The president will attend B. The president to attend C. The president’s attending D. The president attended That the president will attend 59. The lady said she would buy a gift for her daughter with the _____. A. 20 dollar remained B. 20 dollar to remain C. remained 20 dollar D. remaining 20 dollar 60. There was a terrible noi。高一英语上学期期末复习题
相关推荐
00 years ago: Around 1421: 1642: 1769: By 1840: The Maori discovered New Zealand and called it Aotearoa. Chinese sailors discovered the island. The Dutchman Abel Tasman named the islands New Zealand.
will do whatever he wants them to do. They will do ______ ______he wants them to do. anything that 疑问词 + ever和 no matter + 疑问词的区别 : ① 疑问词 + ever可引导名词性从句,在主从句中要充当一定的成分。 Whoever breaks the rule must be
略 ) • Reading each paragraph carefully • Pay attention to the first sentence of each paragraph as it often introduces the main idea. • Identify 3—5 of the most important words and underline them with
ry married a rich Frenchman last year. marry A to B 把 A 嫁给 B He married both his daughters to rich businessmen. adj. married A get/ be married (to B) She has been married for two years. n. marriage 2