高一英语下情态动词内容摘要:
____ so formally. ’t dress B. didn’t have to dress up C. Might not have dressed up D. needn’t have dressed up ’m rather surprised you haven’t reported him to your teacher. In my opinion, you ___ this as soon as you found out he was cheating. A. must have done B. might have done C. should have done D. could have done D C ,常用在否定句和疑问句中。 Dare (need) +S +V S + daren’t (needn’t) +V I daren’t walk through the forest at night. Dare you walk through the forest at night? You needn’t return the book now. Need he go yesterday? 可兼做行为动词的情态动词: need 、 dare ,常用在肯定句中 , 有人称、时态、和数的变化 He needs to go there himself. He has grown up,we don’t need to worry about him. (sb) need( want, request)+ doing/ to be done The house needs cleaning/ to be cleaned The boy needs sending to the hospital at once. 句型 时态 动词 情态动词 dare 实义动词 dare 肯定句 现在时 dare do dare/dares to do 过去时 dare do dared to do 否定句 现在时 daren’t/dare not do do/does not dare (to) do 过去时 dared not do did not dare (to) do 疑问句 现在时 Dare he do? Do you/Does he dare (to) do?。高一英语下情态动词
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高一语文中国现代诗欣赏
态描写) (动态描写) (以动衬静) 毫无希望的死水(第5节) (总结) “死水 ”究竟象征着什么。 • 一、从 《 死水 》 的创作时间看 • 象征着。 • 二、从 《 死水 》 发表的时间看 • 象征着。 • 三、从 《 死水 》 诗集出版时间看 1928 • 象征着。 腐朽的美国社会 垂死的北洋政府 黑暗的中国现实 表 现 手 法 反讽 : 从反面或用反语来讽刺事物。
高一英语下学期beijingopera北师大版
sheng male roles with brightly painted face masks dan female roles jing clown roles chou male roles treasure 18th talking acrobatics Listen to the second part and answer the questions: skills do
高一英语用现在进行时表示将来
⑥ 一般现在时表示将来时 (1) 按规定预计要发生的未来动作 ,仅限于动词 e, go, leave, move, start, return, arrive, begin, stay等动词 . The plane takes off at 10:10. That is, it’s leaving in ten minutes. (2) 用在状语从句中用一般现在时代替将来时。 If you do