高一英语下学期beijingopera北师大版内容摘要:
sheng male roles with brightly painted face masks dan female roles jing clown roles chou male roles treasure 18th talking acrobatics Listen to the second part and answer the questions: skills do Beijing Opera actors need to have? was Beijing Opera performed at the beginning? does it have very loud music and a sharp singing style? 4..Why do performers wear brightly coloured costumes? On openair stages in markets, streets, teahouses or outside temples. In order to be seen clearly by the crowds. In order to be heard over the crowds. Acting, talking, singing, music, dancing and acrobatics. Match the meanings with the pictures on :。高一英语下学期beijingopera北师大版
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
高一英语用现在进行时表示将来
⑥ 一般现在时表示将来时 (1) 按规定预计要发生的未来动作 ,仅限于动词 e, go, leave, move, start, return, arrive, begin, stay等动词 . The plane takes off at 10:10. That is, it’s leaving in ten minutes. (2) 用在状语从句中用一般现在时代替将来时。 If you do
高一英语下册单项选择题课件
s generally considered ___ the first puter. A to invent B inventing C to have invented D having invented CD C 22. Can you __ my voice on the telephone? A know B understand C realize D recognize was
高一英语上学期期中考试复习课件
ause • She looked at Jeff, who was waving his arms. • Before she could move, she heard a loud noise, which grew to a terrible roar. • The girl whose leg was broken in the earthquake was taken to