高一英语上学期期中考试复习课件内容摘要:
ause • She looked at Jeff, who was waving his arms. • Before she could move, she heard a loud noise, which grew to a terrible roar. • The girl whose leg was broken in the earthquake was taken to hospital. The Attributive Clause that • All that can be done has been done. • Paris is the most beautiful city that I’ve ever seen. • The first museum that he visited in China was the History Museum. • What do you think of the people and the things that you saw in the country? • This is the very book that contains the information I need. 单元重点回顾 Unit 5 •take off/go wrong/ in all/ lock sb up/ run after/ bring sb back/on the air/ think highly of •accept/receive •owe sth. to sb. •关系副词引导的定语从句 (when, where, why) The Attributive Clause • This was the moment when Spielberg’s career really took off. • Chuck survives the air crash and lands on a de。高一英语上学期期中考试复习课件
相关推荐
s generally considered ___ the first puter. A to invent B inventing C to have invented D having invented CD C 22. Can you __ my voice on the telephone? A know B understand C realize D recognize was
⑥ 一般现在时表示将来时 (1) 按规定预计要发生的未来动作 ,仅限于动词 e, go, leave, move, start, return, arrive, begin, stay等动词 . The plane takes off at 10:10. That is, it’s leaving in ten minutes. (2) 用在状语从句中用一般现在时代替将来时。 If you do
sheng male roles with brightly painted face masks dan female roles jing clown roles chou male roles treasure 18th talking acrobatics Listen to the second part and answer the questions: skills do
ght DOS 5. to be quiet after nine o’clock in the evening 6. to walk the dog 7. to turn down the radio 8. to speak quietly on the phone 9. to return the key of the front door 10. to help her find a
urth floor is poorly equipped. 2. 关系代词在从句中作宾语且前面没有介词时,常可省略。 . This is the girl with whom he works. 3. 关系副词在定语从句中不可省略。 . I have e to explain the reason why I was absent from the meeting. 4. 只用 that,不用
45 Carefulreading: Read the text paragraph by paragraph and underline some key words. Comedy Para 1 Comedies make people laugh by crossdressing men or women appearing on the stage. funny plays with