函数概念内容摘要:
d). We monly call functions by letters. Because function starts with f, it is a monly used letter to refer to functions. 632 2 xxxfThe left hand side of this equation is the function notation. It tells us two things. We called the function f and the variable in the function is x. This means the right hand side is a function called f This means the right hand side has the variable x in it The left side DOES NOT MEAN f times x like parenthesis usually do, it simply tells us what is on the right hand side. 632 2 xxxfSo we have a function called f that has the variable x in it. Using function notation we could then ask the following: Find f (2). This means to find the function f and instead of having an x in it, put a 2 in it. So let’s take the function above and make parenthesis everywhere the x was and in its place, put in a 2. 623222 2 f 8668623422 fDon’t fet order of operationspowers, then multiplication, finally addition amp。 subtraction Rememberthis tells you what is on the right hand sideit is not something you work. It says that the right hand side is the function f and it has x in it. 632 2 xxxfFind f (2). This means to find the function f and instead of having an x in it, put a 2 in it. So let’s take the function above and make parenthesis everywhere the x was and in its place, put in a 2. 623222 2 f 20668623422 fDon’t fet order of operationspowers, then multiplication, finally addition amp。 subtrac。函数概念
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。