powerfulmiusic内容摘要:

the room. 4. I was too scared about getting caught that first night to be concerned about the old lady with the broken window. 那天晚上我光顾着害怕自己会被抓住,都没有来得及担心那位窗户被砸烂了的可怜的老太太。 get lost 迷路 get changed 换衣服 5. But I was no longer able to feel fortable in her presence. 可是我在她面前再也不能表现得很自在了。 no longer, not… any longer , • no more , not… any more 位置 : no longer , no more在主谓之间。 be动词之后。 • not any longer, not… any more 在句末。 After his parents died he is no longer / no more a student. After his parents died he isn’t a student any longer / any more. 他父母去世后他就不再读书了。 no longer 与 no more 对比 no longer 强调时间 no more。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。