高二英语高完型填空动词练习内容摘要:

er, I decided to keep going. A. slow down B. drop out C. go on D. speed up C C B Ⅲ . 形式或意义相近的动词辨析 1. Is all this pressure necessary? I ______ up leaving the football team. Four other girls did the same, and two of them stopped playing football pletely. A. gave B. kept C. ended D. picked 2. “My name is Jim Shelley and I am an addict … “With these words I began to _____ the problem, the problem of my telephone addiction. A. face B. find C. accept D. notice C A 3. Behind the dance there was a woman ______ a large diamond ring. A. carrying B. dressing C. wearing D. holding 4. In the final year of high school, they ___ applications and send them, with their student records, to the universities which they hope to attend. A. fulfill B. finish C. plete D. acplish 5. Finally I turned the key in the lock and ___ the door open, with Dad still plaining about a hurting knee or s。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。