英语的时态和语态内容摘要:

appear,exist,lie, remain Seem,belong to, depend on. 表一时性动作的词: allow, accept, permit, promise, admit, plete. 表感官的动词: see, hear, notice, feel, smell, Sound, taste,look,watch. 五 过去完成时 1 表过去的过去发生的动作。 在 by, by the end,by the time,until,before,since后接表示过去某 一时间的短语或从句以前发生的动作。 如: By the end of the last year, we had produced 20,000 cars. The train had left before we reached the station. 2 表示未曾实现的希望,打算, 意图,诺言 等。 常用 had hoped/planned/meant/intended /thought/wanted/expected等或上述动词过去不定 式的完成式表示即: hoped/+to have done. 3 “时间名词 +before”在句中做状语,谓语动词用过去完成时; “ 时间名词 +ago” 在句中状语,谓语动词用一般过去式。 如: He said his first teacher had died at least 10 years before. Xiao Hua left school 3 years ago. 4 表示“一 就”的几个句型: Hardly/No sooner/Scarcely had + 主语 +过去分词 +when/than/before+一般过去时。 如: We had no sooner been seated than the bus started.=No sooner had we been seated than the bus started. 5 在 before或 after引导的时间状语从句中用一 般过去时代替完成时。 After he (had)left the room, the boss came in. We arrived home before it snowed. 六 过去将来时 参照一般将来时对比:用 would do ,was/were Goingto do ; e ,go ,leave等过 去进行时表过去将来时; was/were to do was/were about to do。 七 过去进行时 1 表过去某一时刻正在发生的动作或某一阶 内发生或频繁发生。 2 某一动作发生时另一动作正在发生,其中一个由 when或 while引导的时间状语从句。 八 现在完成时 1 现在完成时除了和 for, since引导的状语连用外,还可以和下面的介词短语连用: during/ in/over the last(past。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。