广州版数词复习内容摘要:

enty to nine, five to eight, a quarter to ten 表示“几点几分”还可直接用基数词。 例如: seven fifteen, eleven thirty, nine twenty 注意下列习惯表达方式: half an hour half a kilo one hour and a half= one and a half hours two and a half kilos = two kilos and a half one or two days = one day or two eighty meters long one thousand miles away five meters deep ( wide/ tall/ high/long) five meters in depth / width/ height/ length 序数词的用法 ( 1)序数词主要用作定语,前面要 加定冠词 ,例如: The first truck is carrying a food baskets. John lives on the fifteenth floor. ( 2)序数词有时前面可加 不定冠词 来表示“ 再一 ”,“ 又一 ”这样的意思,例如: We39。 ll have to do it a second time. Shall I ask him a third time。 When I sat down, a fourth man rose to speak. ( 3)表示年,月,日时, 年 用 基数词 表示, 日 用 序数词 表示。 例如: 1949年十月一日读作 : October (the) first, nieen fortynine 2020年九月十日读作: September (the) tenth, two thousand and four ( 4)表示分数时,分子用基数词表示,分母用序数词表示。 分子大于 1时,分母加 s。 例如: 1/4 onefourth。 2/3 twothirds。 1/2 a(one)half。 1/4 1(one)quarter。 3/4 threequarters。 *76/92 seventysix over niytwo ( 5)序数词也可以用作副词, When did you first see him? Which horse came in first? ( 6)基数词也能表示顺序,如书刊的页的数目,住所、房间、教室、电话号码等等。 Page Eight, Room 304, Class Seven, 7)倍数表示法。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。