毛衫qa流程内容摘要:

Neck R/L is not same length 领垃力太紧 Neck stretch is too narrow 后领缝起皱 Puckering at back neck seam 领下有疏吼 Loose knitting under neck 领卷边缝止口太厚 Neck seam knots is too big 领两边起角 The neck opening sides is stick out 领拉必须超 30cm Neck hole stretch M/B over 30cm V 领咀不够尖 Maze nice sharp finishing of V neck shape 卷边不好 poor bowing 领贴过松 collar too loose 领贴过紧 collar too tight 领顶过紧 (无弹性 ) Collar edge is not too inelastic 膊位扭骨 Twist shoulder seam 膊位太平 .膊斜不够 Shoulder seam too flat 膊带太紧 Shoulder tapes are too tight 导致膊位起啄 pulls upward and create a point angle 膊骨缝线太松 Shoulder seam linking thread is too loose 后膊缝线起蛇 Back part linking is wavy 膊骨走前 Shoulder seam forward 膊骨大细 Shoulder head magnitude 大细膊 Uneven shoulder width 膊位起啄 Puckering at shoulder point 高低 膊 Misaligned shoulder 高低肩位 High/low yoke 膊骨太平 Too flat at shoulder seam 膊骨太斜 Too slant of shoulder seam 膊线弯曲不直 Shoulder seam not smooth 膊头拱起 shoulder head not smooth 膊骨起蛇 Shoulder seam wavy 膊两边不对称 Shoulder yoke not balance 膊头缝线不平直 Shoulder seam should be straight 膊骨左右不对称 Unbalanced R/L shoulders 飞机袖 Sleeve raise up 袖骨走前 Underarm seam shown at front 袖走后 Sleeve running to back 袖走前 Sleeve running to front 前袖骨拉松 Too loose at front sleeve seam 后袖骨过紧 Too tight at back sleeve seam 卡夫装得不好 Poor cuff setting 袖叉装得不好 Sleeve placket is not set well 袖底缝被拉松 Underarm seam was stretched 袖缝骨扭 Twisted sleeve seam 袖扭纹 Ribs of sleeve is twist 长短袖 Uneven sleeve length 袖子偏前 Sleeve leans to front 袖子偏后 Sleeve leans to back 前袖缝外翻 Inseam leans to front 袖口起皱 Wrinkles at sleeve opening 袖里拧 Diagonal wrinkles at sleeve lining 扭袖底骨 Twisted underarm seam 袖肚太大 Enlarge sleeve 袖咀卷边不均 Uneven rolled edge at sleeve 袖顶起啄 Top sleeve cap pulled inward 袖位起镜 Pressing mark on sleeve 高低袖咀 Misaligned at sleeve bottom 袖骨哨牙 Open seam at sleeve seam 袖咀囗挑线太松 Loose stitching at sleeve cuff 袖咀囗挑线太紧 Tight stitching at sleeve cuff 袖咀扭曲 Knit sleeve cuff twist 袖起波浪 The sleeve shape is wavy 袖尾凹入 Sleeve tail concave into 袖尾起啄 Puckering at sleeve end 袖褶距离不平均 Uneven distance of sleeve pleat 袖囗没埋口 Cuff assembles to sleeve not closed 袖摺 Pleated seam on sleeve 袖错位 Sleeve misplaced 扭袖 Twisted sleeve 袖摺 Pleated at sleeve joining 袖山起皱 Diagonal wrinkles at sleeve cap 袖口边不平齐 Cuff edge not level 袖底骨扭骨 Twisted underarm 袖 (膊头位 )啄起 Sharp point in sleeve head 袖扭骨 Twisting sleeve 夹边过紧 Tighten armhole tension 高低夹 Unmatched armhole seam 夹位有疏吼 Hole at armhole 夹底有疏吼 Hole at underarm 夹位爆缝 Open seam at armhole 夹位不直 Armhole not straight 夹位要顺直 Pls keep straight on armhole 夹缝不可拉开烫 Avoid pressing out of armhole seam 夹形两边要对称 Keep symmetrical straight on both side of armhole 夹顶起啄 Pulling cut stitch on top armhole 夹位两边不对称 Both side of armhole asymmetrical 夹圈太紧 Tight armhole 夹骨起蛇 Zigzag seaming at armhole 夹骨弯曲起蛇 Wavy armhole seam 左右夹圈不对称 Uneven left / right armhole 左右夹圈有溶位不平服 Puckering at left / right armhole 袖孔不圆顺 Armhole setting not smooth 夹圈起皱 Puckering at armhole 夹缝线哨牙 Armhole seam is stretched out by ironing 夹顶起啄 Top of armhole seam creates a point angle 夹圈底的布太多 .不平均 Uneven fullness at armhole 夹圈起皱 armhole pucker 夹底缝线松 Loose linking threads at under armhole 夹位起蛇 Puckering at armhole 夹圈散口 Armhole fraying 夹底松 Loose stitch at underarm 袖夹太拱 Armhole seam runs arched 夹骨起皱 缩埋 Puckering at armhole linking 骨位没有完全熨开 Seam not fully pressed open 缝骨起皱 Puckered seam 前幅横骨不对称 Front horizontal seam not leveled 底骨露面 Under seam visible 骨位起波浪 Wavy on seams 扭骨 Twisted seams 侧骨扭 Twisting at side seam 骨位结尾不平均 Seam closures uneven 骨位太谷 ,不平服 Fullness on seams 骨位末完全拔开间纱线 Seam not fully opened before stitching 公主骨拉松起泡 Too loose at princess seam 后公主骨起皱 Puckering at back princess seam 侧骨车线太紧或太松 Too tight or too loose at side seam 前中 /后中骨太松 Too loose at CF/CB seam 侧骨起蛇 Side seam is wavy 侧骨缝线太松 Side seam threads is too loose 侧骨烫得太开 ,请补烫 Side seam is stretched out by ironing and stick out please reironing 侧骨扭骨 Side seam twist 侧骨不顺 Uneven side seam 侧骨位要顺直 Straight at side seam 哨牙 Bare linking yarn 不对骨位 Seam parts at seam not match 骨位谷起 Seam pucker 骨位不对称 Mismatched seam 骨位外露 Raw edge shows 处骨走位 Out seam run off stitch 嵌骨 Coverlocking 嵌骨不均匀 Uneven coverlocking 嵌骨线太松 loose stitch tension 嵌骨线不配色 Coverlocking thread not match 嵌骨线不直 Coverlocking not straight 缝骨露线 Seam grin 下裆十字骨错位 Unmatched crotch cross 骨位打摺 Pleated seam 水平缝骨 (左右 )不对称 Horizontal seam not leveled 脚弯位不圆顺 The bottom curve is not smooth 左右开又长短不一 Vent length uneven 长短脚 Uneven leg length 衫脚不平均 ,不对称 Uneven hem line 脚边不平 .起皱 Puckering at hem linking 衫脚拉得太紧 Bottom hem stretch a bit tight 衫脚起波浪 Bottom hem is wavy 衫脚卷边欠平均 Uneven rolled edge of bottom hem 脚叉不平齐 Slit are extremely gaping 脚边啄出 Hem edge stick out 脚纹不顺 Wavy hem rib 前后脚叉长短 Front /back slits is not same length 衫脚套针线太紧 The hem stretch have a bit tight 衫脚套针线起耳仔 The hem edge show the yarn loops is linking 衫脚罗纹边线太松 The hem edge knitting tension is too loose 脚罗纹太紧 .没有弹性 Hem ribs tension is too tight and not elastic enough 衫脚不直 Bottom not straight 脚边不齐 Uneven bottom hem 衫脚戚起 Bottom stretch up 下摆丝带太紧 ,Seam binding stitch tension is too tight 使下摆不平顺 Causing bottom not smooth 折车 1/2脚围活窄 Uneven folded width at bottom sweep 1/2 hemming 衫脚扭 Twisted bottom 高低脚 Uneven edge on cuff or bottom 挑脚线露面 Bhnd stitching visible 严重长短脚 Misaligned conspicuous 下脚不够直 Bottom hem is not straight 下脚扭纹起豆角 Twisting hem puckering at hem 高低脚 Uneven hem 横条起波浪 Wavy stripes 不对格 /不对条 Mismatched stripe check 间条 /格仔未对好 Pattern matching is not well 条纹必须保持同一宽度 Little ring stripe must always be of same breadth 前幅间色不对称 R/L stripe is unmatched at front part 间色不平均 Uneven stripe 侧骨间色不对称 Stripe not match at side seam 间色两边不对称 Unbalance stripe 直条不对齐 Mismatched plaids 横间不对齐 Mismatched stripe 前后幅间色不对齐 Fro。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。