机构名称:通标标准技术服务有限公司武汉分公司检测中心内容摘要:

The scope of the accreditation in Chinese remains the definitive version. 序号 检测 对象 项目 /参数 领域 代码 检 测 标准( 方 法 ) 名 称及编号(含年号) 限制 范围 说明 序号 名称 6 塑料、橡胶、泡沫材料、涂层及其产品 1 温度湿度组合循环试验 0328 环境试验方法 第 238部分 试验 Z/AD:温度湿度组合循环试验 IEC 60068238:2020 温度范围: 40℃~+150℃ 湿度范围:25%RH~98%RH 2 高温试验 0328 环境试验方法 .第 22部分 试验 B:高温 IEC 6006822:2020 温度范围: 室温~+300℃ 3 低温试验 0328 环境试验方法 第 21部分 试验 A:低温 IEC 6006821:2020 温度范围: 0℃~ 70℃ ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4599 第 14 页 共 151 页 The scope of the accreditation in Chinese remains the definitive version. CHINA NATIONAL ACCREDITATION SERVICE FOR CONFORMITY ASSESSMENT APPENDIX OF ACCREDITATION CERTIFICATE (Registration No. CNAS L4599) NAME:SGSCSTC Standards Technical Services Co., Ltd. Wuhan Branch Testing Center ADDRESS:, Xinghua Road, Economic Development Zone, Wuhan, Hubei, China Accreditation Criteria:ISO/IEC 17025:2020 and relevant requirements of CNAS Date of Issue:20200523 Date of Expiry:20200522 Date of Update: 20200523 APPENDIX 2 ACCREDITED TESTING № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Metallic materials 1 Tension testing Rm/Fm/ReH/ReL/Rp0.2/.5/A/Z 0301 Metallic materials Tensile testing at ambient temperature GB/T Accredited only for 600kN 0301 Standard Test Methods for Tension Testing of Metallic Materials ASTM E8/E8M11 Accredited only for 600kN 0301 Metallic materials Tensile testing at ambient temperature ISO 68921:2020 Accredited only for 600kN ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4599 第 15 页 共 151 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Metallic materials 2 Bend testing 0301 Metallic materialsBend test GB/T 2322020 Accredited only for the pressing bend method 0301 Metallic materials Bend test ISO 7438:2020 Accredited only for the pressing bend method 0301 Standard Test Methods for Bend Testing of Material for Ductility ASTM E29009 Accredited only for guided bend method , bend and flatten method 3 Charpy Impact test AKV2/AKU2/、 AKU5 0301 Metallic materialsCharpy notch impact test GB/T 2292020 Accredited only for 60℃ to ambient temperature 0301 Standard Test Methods for Notched Bar Impact Testing of Metallic Materials ISO 1481:2020 Accredited only for 60℃ to ambient temperature 4 Flattening test 0301 Metallic materials—Tube GB/T 2462020 Accredited only for:diameter450mm 0301 Metallic materials—Tube ISO 8492:1998 Accredited only for :diameter450mm ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4599 第 16 页 共 151 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Metallic materials 5 Rockwell hardness test HRB/HRC/HR30N/HR15N/HR30T 0301 Metallic Rockwell hardness test— Part 1: Test method GB/T 0301 Standard Test Methods for Rockwell Hardness of Metallic Materials ASTM E1811 0301 Metallic Rockwell hardness test— Part 1: Test method EN ISO 65081:2020 6 Vickers hardness test /5/10/ 0301 Metallic materials Vickers hardness testPart 1:Test method GB/T 0301 Standard Test Method for Microindentation Hardness of Materials ASTM E38411e1 0301 Metallic materials Vickers hardness testPart 1:Test method EN ISO 65071:2020 ISO/IEC 17025 认可证书 CNASPD20/09B/1 No. CNAS L4599 第 17 页 共 151 页 The scope of the accreditation in Chinese remains the definitive version. № Test Object Item/Parameter Code of Field Title, Code of Standard or Method Limitation Note № Item/ Parameter 1 Metallic materials 7 Brinell hardness test 0301 Metallic materialsBrinell hardness testPart 1:Test method GB/ Except for: 1mm diameter of ball/below 125kgf 0301 Standard Test Method for Brinell Hardness of Metallic Materials ASTM E102020 Except for: 1mm diameter of ball/below 125kgf 0301 Metallic materialsBrinell hardness testPart 1:Test method EN ISO 65061:2020 Except for: 1mm diameter of ball/below 125kgf 8 Metallic and oxide coatings thickness 0355 Metallic and oxide coatingsMeasurement of coating。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。