高考英语阅读复习方法内容摘要:

• • +寻读 • +边读问题 , 边读文章 解题方法 • 4个选项之间的区别 . • . • . • ,善于抓关键词、关键句 . • 和观点 . • 6. 不同的题型采用不同的对策 . 猜测词义型 常见的设题方式有 : • word________could best be replaced by________. • of the following is closest in meaning to the word________. • writer means________. • the ______paragraph, the word_______ means (refers to )_______. • underlined word_______is closest in meaning to _______. 方法 1: 定义,解释法 信息词:  means, that is, that is to say, in other words, refer to ... namely。 in other words。 that means eg. They surrendered, that is, threw out their weapons and walked out with their hands above their heads.  方法 2:同义关系 信息词: and。 not only…but also…。 besides。 similarly。 likewise。 in the same way eg. Our uncle was a roamer, an wanderer who never could stay one place. 方法 3:反义关系 信息词 : another, but, however, instead, like, though/although, still, while, on the other hand eg. Jane was talking with others while Tom remained reticent all the time. 方法 4:逻辑关系 如对比,转折,因果,让步等 eg. He is generous, though he is not rich.  其他方法: 如构词法 , 举例 , 标点 (冒号,破折号)等 The captain39。 s courage, perseverance, and powerful will mastered every man on board, and we went to work again. 事实细节型 常见的设题方式有 : • 1. Which of the following is true / false / mentioned? • 2. What does the writer pay least attention to ? • 3. All of the following statements may be true / false except_______? • 4. Choose the right order of the events given is the passage. • 5. Which of the following maps/diagrams gives the right position of ……../ relationship of… ? • 6. Which of the following is not the result of …? • 7. Which of the following best ch。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。