高二英语英语单项解题思路内容摘要:

What made her so upset? ______ her wallet. A. She lost B. To lose C. Lost D. Losing ∧ they are made her so upset. be supposed 意为“被期望” 五 信息词提示法 1. Alice, why didn’t you e yesterday? I _____, but I had an unexpected visitor. A. had B. would C. was going to D. did 2. On Saturday afternoon, Mrs Green went to the market, _______some bananas and visited her cousin. A. bought B. buying C. to buy D. buy 连词 and 我打算来的 ,但我有个不速之客。 went , bought and visited 三个动作并列。 六 标点符号提示法 1. Your performance in the driving test didn’t reach the required standard— ______ ,you failed. A. in。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。