高二英语上学期省略句内容摘要:

where. A. to do B. to C. doing D. doing so  4. –I slipped on the stairs. I think my arm is broken. Oh! I ________. A. don’t hope so B. hope so C. don’t hope D. hope not  didn’t give me the chance, though he ______. A. had promised to B. had promised C. promised to D. promised it.  6. –I’ll be away on a business trip. Would you mind looking after my cat? Not at all. _________. A. I’ve no time B. I’d rather not C. I’d like it D. I’d be happy to  I’d love to. I’d like to. Join the two sentences together with the conjs. • He was driving to work yesterday. He had。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。