高二英语上学期期考复习内容摘要:
had written。 had left D. were writing。 had left that从句限制 those, 意思是“你可以把这些书交给最需要的那些人。 ” 第一个 that引出定语从句,第二个 that 与 so 构成搭配。 当一个动作 went发生的时候,另一个动作 write正在发生; had left“表示过去的过去” the wheelchair, the old man thought of his son who bought it for him. A. Sat B. Sitting C. Sitting in D. When sitting 17. I have good eyesight. I can see _______ the distant island in the sea. A. as far as B. so long as C. as long as D. so far 18. It is _______ but not _______ that Auntie will e over to see us. A. likely。 possible B. probably。 likely C. probably。 possible D. possible。 probable Sitting的逻辑主语是 the old man, sit 是不及物动词,后面要加介词后 才能接宾语。 As far as 意为“远至”, so far “到目前为止” So long as / as long as 1. “与 …… 一样长” 2. 只要 Probable > likely / possible is our school, _______ is _______ the factory by a river. A. it。 made up B. which。 separated from C. as。 divided into D. that。 consisted of 20. _______, so we have taken Jim to hospital. Which of the following can39。 t be used? A. Something has wrong with Jim B. There is something wrong with Jim C. Something is the matter with Jim D. Something is wrong with Jim 21. — Good morning. Can I help you? — _______. — How do you want to send them? — _______. A. I think I should send them by airmail。 I39。 d like to buy three tenyuan stamps B. I want to send these letters to the United States。 I guess I should send them by airmail C. I39。 ll fly back to the United States。 You may send to me D. Stamps, please。 I39。 ll write home Be separated from:与 …… 分隔开。 be divid。高二英语上学期期考复习
相关推荐
where. A. to do B. to C. doing D. doing so 4. –I slipped on the stairs. I think my arm is broken. Oh! I ________. A. don’t hope so B. hope so C. don’t hope D. hope not didn’t give me the chance,
e up of / consisted of ten doctors and thirty nurses. *Only the northern counties, making up Northern Ireland, are still part of the United Kingdom. () Revision of make up: A. to bee friends again B.
如果含有从句时,只要求主句倒装: 例: Only after he had spoken out the word did he realize that he had made a big mistake.(只有当他已经说出那个字后才意识到自己犯了个大错误。 ) 如置于句首的 only修饰主语,则不用倒装结构。 back 含有否定意义的副词或连词放在句首时 常用否定词有: never,
did realize D. didn’t the villagers realize B A 5. Only in this way ____ do it well. A. must we B. we could C. can we D. we can 6. Hardly ____ when it began to rain. A. had he arrived B. arrived he C
he scientific method? Para 7 What is it that Hawking does not like about his speech puter? Para 1: What did he suffer from and what might have happened to him? He suffered from an incurable
nce translated into Chinese, the book became very popular among Chinese teenagers. = If we were given more time, we would be able to do the work much better. = Once it was translated into Chinese,